Laserfiche WebLink
tae <br />40 <br />Dr. Funding Sources (round figures to the nearest dollar) <br />The maximunt FEMAshare far ffAfGP1FMA projects Is 75%. The other 25% cart he made up of State and Local funds as well as in- <br />kind services. Moreover, the FMA program requires that the maximum in-kind match be no more than 12.5°I of the total Project costs. <br />11MGPtFMA funds clay be Packaged with other Federal funds, but other Federal funds (except for Federal funds which lose their <br />Federal identity at the State level -- such as CDBG, ARS, HOME) may not be used for the State or Local match. <br />Estimated FEHA Share $17.493.7575%o of Total (maximum af75%) <br />Nan -Federal Share <br />Estimated Local Share <br />Estimated State Share <br />$ -0- <br />$ •0• - <br />S $.831.25 <br />• of Total (Cash) <br />of Total (1n -kind) <br />25% of Tota i (Cash) <br />.% of Total ([n -kind) <br />Other Agency Share $ -0- % of Total <br />(Identity Other Non -Federal Agency NIA l <br />Total funding sources from above $23,325 too Total % (should equal 100%) <br />Other Non -FEMA Federal Funds $ NIA (Do not include in total) <br />(Identify Other Federal Agency NIA <br />F, Project Milestones <br />List the major milestones in this Project by providing an estimated lime -line for the critical activities. <br />Milestone <br />mwlilion of G structures and removal of debrist4 days) <br />Provide adequate window protection for public wind shelter. <br />Man ber o Davs to Qmwlete <br />7 -days following award of contract <br />Pager 7 of 15 <br />