Laserfiche WebLink
40 <br />CJ <br />- D. Funding Sources (round figures to tate nearest dollar) <br />The maximum FEAM share for IIMCP/f'AfA projects is 75%. The other 25% can be made up of State and local funds as well as in- <br />kind services. Moreover, the FMA program requires that the maximum in-kind match be no more than 12.5% of the total project costs. <br />1PMGPIFMA funds may be packaged with other Federal funds, but other Federal funds (except for Federal finds which lose their <br />Federal identity at the State level - such as CDBG, ARS, IH3ME) may not be used for the State or Local match. <br />Eslim ated FEMA Share 512E 075, 0 _ 75% of Total (max ilnum of 75%) <br />Non -Federal Share <br />Estimated Local Share5 0- °/a of Total (Cash) <br />S -0- %of Total (In-kind) <br />Estimated State Share $ 42 025.00 25% of Total (Cash) <br />5 °lo of Total (In-kind) <br />Other Agency Share $ -0» %of Total <br />(Identify Other Non -Federal Agency NIA <br />Total 1,unding sources from above $168,100 100 _Total % (should equal 100°/x) <br />Other Nan -FEMA Federal Funds $ N!A _ (I)o not include in 101a1) <br />(Identify Other Federal Agency NIA ---- — ) <br />E. Project Milestones <br />List the major milestones in this project by providing an estimated time -line for the critical activities. <br />Mtieslone Number ofDays to C rn fele <br />1, g., 1)em°Iition of 6 suvclures and removal of d°bris1 d days' <br />Provide adequate window protection for public wind shelter. 7 -days following award of contract <br />Page 7 of 15 <br />