My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-337K
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-337K
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2024 11:01:12 AM
Creation date
8/15/2024 11:00:09 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Application
Approved Date
11/07/2000
Control Number
2000-337K
Agenda Item Number
11.B.
Entity Name
State of Florida Dept. of Community Affairs
Subject
Hazard Mitigation Grant Program Application for Shelter Retrofits Projects
Pelican Island Elementary
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />1 40 C. City or County Map with Project Site and Photographs <br />• Attach a copy of a city or county wale map (large enough to show tine entire project area) with the project <br />site and structures marked on the map. <br />• Attach a USGS 1:24,000 topo trap with project site clearly marked on the map. <br />q <br />For acquisition or elevation projects, include copy of Parcel Map (Tax Map, property Identification Map, <br />etc.) showing cacti property to be acquired. `Clic map should include the Tax iD numbers for each parcel, if <br />possible. <br />Attach photographs (2 copies each) for cacti project site. The photographs should be representative of the <br />project area, including any relevant streams, creeks, rivers, etc. and drainage areas which affect the project site <br />or will be affected by the project. <br />Section IV. Budget/Costs <br />In this section, provide details of all the estimated costs of the project. As this information is used for the Benefit -Cost Analysis, <br />reasonable cost estimates are essential. Since project administrative costs are calculated on a sliding scale, do not include them in tate <br />budget. Also, do not include contingency casts in the budget. <br />A. Materials <br />Item Dimension Quantif Coster Unit Cast <br />SEE BELOW <br />B. Labor (Include equipment costs -- please indicate all "soft" or in-kind matches) <br />D@.:Cr%l7ti077 hours Rate Cost <br />SEE BELOW <br />C. Fees Paid Include any other costs associated with the project. <br />Description of nsk Hours Rate Cost <br />N/A <br />Total Estimated Project Cost $ G1.G00* <br />*The estimated cost of this project includes all labor and materials based on an estimate provided by a, <br />professional and licensed project contractor. Estimates were not detailed with materials and labor, as is <br />customary with projects or this type. <br />Page 6 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.