My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-337K
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-337K
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2024 11:01:12 AM
Creation date
8/15/2024 11:00:09 AM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Brading Sources (round figures to the nearest dollar) <br />The marimum RUM shorefor HUG111rXIA Projects is 75%. The other 25% can be made up of State and Local funds as well as in- <br />land services. Moreover, the FMA program requires that the maximum in-kind match be no more than 12.5°% of the total project costs. <br />HMGP/FMA funds may be packaged with other Federal funds, but other federal funds (except for Federal funds which lose their <br />Federal identity at the State level — such as CDBG, ARS, HOME) may not be used for the State or Local match. <br />Estimated f'F_hiA Share $4 2{36.00 75°% of Total (maximum of 75"% <br />Non -Federal Share <br />Estimated Local Share <br />Estimated State Share <br />$ -0- <br />$ 15.400.00 <br />O/o of Total (Cash) <br />% of Total (ht -kind) <br />2$% of `i'olal (Cash) <br />°/a of Total (in-kind) <br />Other Agency Share $ -0- e% of Total <br />(identify other Non-federal Agency NIA <br />Totat Funding sources frons above $61,600.00 _ 100 Total % (should equal 100%) <br />Other Non -FEMA Federal Funds 5 N/A (Do not include in total) <br />(Identify Other Federal Agency NIA- <br />El. <br />IA <br />L. Project Milestones <br />List the major milestones in this project by providing an estimated time -line for the critical activities. <br />Milestone Number of Dans to Complete <br />je.g., oCFMlitiun of G struclutesand removal ordebrisH days) <br />Provide adequate window protection for public wind shelter. 7 -hays following award of contract <br />Page 7 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.