Laserfiche WebLink
U-3 <br />40 <br />• <br />3. Provide a designated Point of Contact. <br />SCHEDULE <br />The services described above are anticipated to be completed in accordance with the <br />Following schedule: <br />1. Kick off meeting and visit within two (2) weeks of notice to proceed. <br />2. The draft report to IRCU within four (4) weeks of progress report meeting. <br />3. Final report within one (l) week of receipt of County comments on draft technical <br />memorandum. <br />COMPENSATION <br />Compensation to the Engineer for services performed under this fee proposal will be in <br />accordance with an hourly rate not to exceed limit method. The not to exceed limit for <br />the Engineer shall be $12,411, as shown in the enclosed Tables l through 3. <br />