Laserfiche WebLink
40 <br />4b <br />Mixing Concentrate with Reclaimed Water Budget Estimate <br />PILOT PLANT <br />MATERIAL AND LABOR $100,000.00 <br />ENGINEERING, PERMITTING AND LAB WORK $100,000.00 <br />CONSTRUCTION SUB -TOTAL $ 200,000.00 <br />15% CONTINGENCY $ 30,000.00 <br />TOTAL CONSTRUCTION COST ESTIMATE $ 230,000.00 <br />