Laserfiche WebLink
40 <br />4w <br />�011= 31x1 Stage R.O. Memtxane Pilot Plant Budget Estimate <br />MATERIAL <br />$ <br />15,800.00 <br />LABOR <br />$ <br />5,200.00 <br />UTILITIY TRAILER <br />$ <br />8,000.00 <br />ENGINEERING, PERMITTING AND LAB WORK <br />$ <br />35,000.00 <br />CONSTRUCTION SUB -TOTAL <br />$ <br />64,000.00 <br />15% CONTINGENCY <br />$ <br />9,600.00 <br />PILOT PLANT TOTAL <br />$ <br />73,600.00 <br />