My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-380
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-380
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2024 1:25:33 PM
Creation date
8/20/2024 1:19:06 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
12/19/2000
Control Number
2000-380
Agenda Item Number
11.C.2.
Entity Name
Tri Sure Corp.
Subject
Sebastian Water Assessment Project Phase 3A
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6706-060 <br />4. Shop Drawings and Samples: <br />a. Receive and record date of receipt of Shop Drawings and samples, <br />receive samples which are furnished at the site by CONTRACTOR, and <br />notify ENGINEER of their availability for examination. <br />b. Advise ENGINEER and CONTRACTOR or his superintendent immediately <br />of the commencement of any Work requiring a Shop Drawing or sample <br />submission if the submission has not been approved by the ENGINEER. <br />5. Review of Work, Rejection of Defective Work, Inspections and Tests: <br />a. Conduct on-site observations of the Work In progress to assist ENGINEER <br />In determining If the Work Is proceeding in accordance with the Contract <br />Documents and that completed Work will conform to the Contract <br />Documents. <br />b. Report to ENGINEER whenever he believes that any Work is <br />unsatisfactory, faulty or defective or does not conform to the Contract <br />Documents, or does not meet the requirements of any Inspections, tests <br />or approval required to be made or has been damaged prior to final <br />payment; and advise ENGINEER when he believes Work should be <br />corrected or rejected or should be uncovered for observation, or requires <br />special testing, Inspection or approval. <br />c. Verity that tests, equipment and systems startups arid operating and <br />maintenance Instructions are conducted as required by the Contract <br />Documents and In presence of the required personnel, and that <br />CONTRACTOR maintains adequate retards thereof; observe, record and <br />report to ENGINEER appropriate details relative to the test procedures and <br />startups. <br />d. Accompany visiting inspectors representing public or other agencies <br />having jurisdiction over the Project, record the outcome of these <br />Inspections and report to ENGINEER. <br />6. Interpretation of Contract Documents: Transmit to CONTRACTOR <br />engineer's clarifications and Interpretations of the Contract Documents. <br />7. Modifications: Consider and evaluate CONTRACTOR'S suggestions for <br />modifications In Drawings or Specifications and report them with <br />recommendations to ENGINEER. <br />LTJ <br />L <br />L2I21MG <br />00600-40 ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.