Laserfiche WebLink
6706-060 <br />12. Completion: <br />e. Before ENGINEER issues a Certificate of Substantial Completion, submit <br />to CONTRACTOR a list of observed Items requiring completion or <br />correction, <br />b. Conduct final inspection In the company of ENGINEER, OWNER and <br />CONTRACTOR and prepare a final list of Items to be completed or <br />corrected. <br />c. Verify that all Items on final list have been completed or corrected and <br />make recommendations to ENGINEER concerning acceptance. <br />C. LIMITATIONS OF AUTHORITY <br />Except upon written Instructions of ENGINEER, Resident Project <br />Representative: <br />1. Shall not authorize any deviation from the''Contract Documents or approve <br />any substitute materials or equipment. <br />2. Shall not exceed limitations on ENGINEER'S authority as set forth In the <br />Contract Documents. <br />3. Shall not undertake any of the responsibilities of CONTRACTOR, <br />Subcontractors or CONTRACTOR'S superintendent, or expedite the Work. <br />4. Shall not advise on or Issue directions relative to any aspect of the means, <br />methods, techniques, sequences or procedures of construction unless such is <br />specifically called for in the Contract Documents. <br />B. Shall not advise on or Issue directions as to safety precautions and programs <br />In connection with the Work. <br />6. Shall not authorize OWNER to occupy the,Project in whole or in part. <br />7. Shall not participate in specialized field or laboratory tests. <br />END OF SECTION <br />00800-42 <br />]I]1K6 <br />