My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-380
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-380
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2024 1:25:33 PM
Creation date
8/20/2024 1:19:06 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
12/19/2000
Control Number
2000-380
Agenda Item Number
11.C.2.
Entity Name
Tri Sure Corp.
Subject
Sebastian Water Assessment Project Phase 3A
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UTIL (EJCDC. FMT):as <br />EJCDC <br />STANDARD FORM OF AGREEMENT <br />BETWEEN OWNER AND CONTRACTOR <br />ON THE BASIS OF A STIPULATED PRICE <br />THIS AGREEMENT, dated the day of in the year <br />2000 by and between Indian River County, a political subdivision of <br />the State of Florida (hereinafter called OWNER) and Tri -Sure <br />Corporation.lhereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants <br />hereinafter set forth, agree as follows: <br />Article 1. WORK. <br />CONTRACTOR shall complete all work as specified or indicated in the <br />Contract Documents. The work is generally described as follows: <br />Construction of approximately 126 L.F. of 12" DIP, 6,374 L.F. of <br />12" PVC, 2,864 L.F. of 6" DIP, 36,796 L.P. of 6" PVC, 3,300 L.F. of <br />4" PVC water main in the Sebastian Highlands Subdivision - Phase 3A <br />from existing water mains located on Barber Street, along with fire <br />hydrants and services. Restore the right-of-ways as close as <br />possible to the pre -construction condition or better. Construction <br />consists of, but is not limited to utilities exploration, <br />coordination with any permitting agencies, trenching, dewatering, <br />installation of pipe with fittings and all appurtenances, <br />restrainers and soil compaction, disinfection, testing (includes <br />providing temporary jumper or another approved method for <br />disinfection and flushing) irrigation repair and traffic control. <br />The PVC pipe shall be C-900 and the DIP pipe shall be pressure <br />class 350 per Indian River County Utility Standards and <br />Specifications (with metal thickness equal or exceeding the Class <br />50 for under road). The Contractor shall clearly specify the one <br />used on the bid. <br />CONTRACTOR, as an independent contractor and not as an employee, <br />shall furnish, for the sum amount of $1,364,954,00, all of the <br />necessary labor, material, and equipment to perform the work <br />described above in accordance with the Contract Documents. <br />Article 2. ENGINEER. <br />The project has been designed by Indian River County Utilities <br />Department, hereinafter called ENGINEER, and who is to act as <br />OWNER'S representative, assume all duties and responsibilities and <br />have the rights and authority assigned to ENGINEER in the Contract <br />Documents in connection with completion of the work in accordance <br />with the Contract Documents. <br />FA -1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.