My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-380
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-380
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2024 1:25:33 PM
Creation date
8/20/2024 1:19:06 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
12/19/2000
Control Number
2000-380
Agenda Item Number
11.C.2.
Entity Name
Tri Sure Corp.
Subject
Sebastian Water Assessment Project Phase 3A
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 3. CONTRACT TIME. <br />._. 3.1 The work will be completed in accordance with the <br />following time frame. <br />(a) Within 40 calendar days from effective date of <br />Notice to Proceed, CONTRACTOR shall complete the <br />following tasks: <br />1. Obtain all necessary permits. <br />2. Receive approved shop drawings for all <br />materials and equipment to be utilized in the <br />job. <br />3. Perform all photographic recording and <br />documentation of conditions prior to <br />construction. <br />4. Locate all existing utilities in the area of <br />work. <br />S. Mobilize all labor, equipment, and materials. <br />6. Deliver and store all equipment and materials <br />to the job site. <br />7. Notify all utilities and other affected <br />parties prior to initiating construction. <br />(b) From 41 calendar days to 170 calendar days from the <br />effective date of Notice to Proceed, the CONTRACTOR <br />shall complete the following tasks: <br />1. Install all pipe and appurtenant items. <br />2. Perform all testing. <br />3. Restore all disturbed areas to their <br />preconstruction condition. <br />4. Correct all deficiencies noted by ENGINEER. <br />Completion of all tasks outlined above (i.e., Subparagraphs a <br />and b) constitute Substantial Completion. <br />c) From 171 calendar days to 2200 calendar days from <br />the effective date of Notice to Proceed, the <br />CONTRACTOR shall complete the following tasks: <br />1. Clean up project area. <br />2. Remove all equipment and material from project <br />site. <br />3. Perform contract close-out procedures. <br />Completion of all tasks outlined above (i.e., Subparagraphs a, <br />b, and c) constitutes final completion. <br />PA -2 <br />