Laserfiche WebLink
Project Totals <br />CEI Senior Project Engineer Kell Cower, PE <br />Firm <br />Co ^s01 <br />Bill Rate.. <br />$23u.34 <br />_ <br />,. <br />0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.5C 0.50 <br />0.30 <br />TOTAL STAFFING <br />M <br />Man an <br />Months Noun <br />5.30 916.9 <br />COST to <br />COMPLETE <br />Total Cost ,..,. <br />5 11,191.7SCEI <br />Project Administrator Colton Griffin <br />Consor <br />$ 165.34 <br />0.50 <br />0.50 <br />0.50 <br />0.50 <br />0.50 <br />0.50 <br />0.50 <br />0.50 0.50 0.50 <br />0.50 <br />5.50 <br />951.5 <br />$ 154321.01 <br />CEI Assistant PA Tyler Storey <br />Consor <br />$ 114.44 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 1.00 0.50 <br />O.So <br />10.00 <br />1730 <br />$ 187.881.20 <br />CEI Contract Support Specialist Stac Griffin <br />Corradino $ 1D&28 <br />0.50 <br />0.50 <br />0.50 <br />0.50 <br />0.50 <br />0.50 <br />C.SO <br />0.30 3C 0.30 <br />0.30 <br />4.70 <br />813.1 <br />$ 86,416.27 <br />CEI Senior Inspector Ralph Lachance <br />Consor <br />$ 87.61 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />8.00 <br />1384 <br />$ 135,08224 <br />CEI Inspector Tyler O'Neill <br />Consor <br />$ 71-94 <br />1.00 1 <br />1.00 <br />1 1.00 <br />1,00 <br />1.00 <br />1.00 <br />1.00 <br />7.00 <br />1211 <br />$ 87,118.34 <br />CEI Inspector Robert Liverman <br />Consor <br />$ 71.94 <br />1 1 <br />1 1.00 <br />too <br />too <br />1.00 <br />4.00 <br />682 <br />$ 48,782.47 <br />CEI Inspector Aide Maria Polanco <br />Consor <br />$ 56.92 <br />1 1.00 1 <br />1.00 <br />1 1.00 <br />1.00 <br />1.00 <br />1.00 <br />6.00 <br />1038 <br />$ 58,082.96 <br />CEI Inspector Ai a Christian Leon <br />Consor <br />$ 56.92 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />6.00 <br />1038 <br />$ 58,oe2s6 <br />Su Ney <br />24,990.00 <br />Geotech $ <br />Asphalt $ <br />52,4C0.00 <br />Lab $ <br />15,260.00 <br />Expenses $ <br />22.000.00 <br />Estimate Cost to Complete $ <br />1,157,727.20 <br />Less amt remain $ <br />557,887.98 <br />Additional funds needed $ 589,859.22 <br />