My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-189
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-189
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2024 11:39:46 AM
Creation date
9/23/2024 11:38:04 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
08/20/2024
Control Number
2024-189
Agenda Item Number
8.BA.
Entity Name
Consor Engineers, LLC
Subject
Amendment No.1 Construction Engineering and Inspection Services
for 66th Avenue from 49th Street to 69th Street Roadway Widening FDOT FM No. 436379-1-54-01
Project Number
IRC-1505
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Totals <br />CEI Senior Project Engineer Kell Cower, PE <br />Firm <br />Co ^s01 <br />Bill Rate.. <br />$23u.34 <br />_ <br />,. <br />0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.5C 0.50 <br />0.30 <br />TOTAL STAFFING <br />M <br />Man an <br />Months Noun <br />5.30 916.9 <br />COST to <br />COMPLETE <br />Total Cost ,..,. <br />5 11,191.7SCEI <br />Project Administrator Colton Griffin <br />Consor <br />$ 165.34 <br />0.50 <br />0.50 <br />0.50 <br />0.50 <br />0.50 <br />0.50 <br />0.50 <br />0.50 0.50 0.50 <br />0.50 <br />5.50 <br />951.5 <br />$ 154321.01 <br />CEI Assistant PA Tyler Storey <br />Consor <br />$ 114.44 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 1.00 0.50 <br />O.So <br />10.00 <br />1730 <br />$ 187.881.20 <br />CEI Contract Support Specialist Stac Griffin <br />Corradino $ 1D&28 <br />0.50 <br />0.50 <br />0.50 <br />0.50 <br />0.50 <br />0.50 <br />C.SO <br />0.30 3C 0.30 <br />0.30 <br />4.70 <br />813.1 <br />$ 86,416.27 <br />CEI Senior Inspector Ralph Lachance <br />Consor <br />$ 87.61 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />8.00 <br />1384 <br />$ 135,08224 <br />CEI Inspector Tyler O'Neill <br />Consor <br />$ 71-94 <br />1.00 1 <br />1.00 <br />1 1.00 <br />1,00 <br />1.00 <br />1.00 <br />1.00 <br />7.00 <br />1211 <br />$ 87,118.34 <br />CEI Inspector Robert Liverman <br />Consor <br />$ 71.94 <br />1 1 <br />1 1.00 <br />too <br />too <br />1.00 <br />4.00 <br />682 <br />$ 48,782.47 <br />CEI Inspector Aide Maria Polanco <br />Consor <br />$ 56.92 <br />1 1.00 1 <br />1.00 <br />1 1.00 <br />1.00 <br />1.00 <br />1.00 <br />6.00 <br />1038 <br />$ 58,082.96 <br />CEI Inspector Ai a Christian Leon <br />Consor <br />$ 56.92 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />6.00 <br />1038 <br />$ 58,oe2s6 <br />Su Ney <br />24,990.00 <br />Geotech $ <br />Asphalt $ <br />52,4C0.00 <br />Lab $ <br />15,260.00 <br />Expenses $ <br />22.000.00 <br />Estimate Cost to Complete $ <br />1,157,727.20 <br />Less amt remain $ <br />557,887.98 <br />Additional funds needed $ 589,859.22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.