My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-027A
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-027A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2024 12:46:08 PM
Creation date
9/24/2024 12:46:02 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
01/31/2024
Control Number
2024-027A
Agenda Item Number
12.G.1.
Entity Name
Halley Engineering Contractors, Inc.
Subject
Change Order No. 3 for 66th Avenue Roadway Widening from 49th Street to 69th Street &
Construction of 53rd Street Signalized Intersection
Bid Number
IRC-1505
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 2 <br /> a. Avoidability Code: 0- Unavoidable: No Remedial Action Required <br /> b. Cost Recovery Code: N - No Action Recommended <br /> c. Claim/Extend Limits Code: N—Neither <br /> V. Premium Cost Analysis <br /> There will be no premium costs involved with the change from three (3) proposed travel lanes to <br /> five (5) proposed travel lanes on the 53rd Street Bridge. None of the costs are the result of rework, <br /> delay, or inefficiency, therefore none of the costs associated with this issue are considered <br /> premium. <br /> ❑x Agree El Disagree <br /> Pursue Cost Recovery? ❑ Yes IXI No <br /> VI. Statement of Claim Settlement Costs <br /> None <br /> VIII. Statutory Reason: <br /> This contract modification is being done in compliance with Florida Statute 337.11 (9), to make the project <br /> functionally operational in accordance with the intent of the original contract. <br /> VII. Federal Aid Participation <br /> Time: Zero (0) Days <br /> Cost: Increase of Eight Hundred Fourteen Thousand Two Hundred Seventy-Seven and <br /> Fourteen Cents ($814,277.14). <br /> ❑ Participating ❑x Non-Participating <br /> Kelly Cowger, P.E. —Sr. Project Engineer <br /> Attachments <br /> • Appendix A: Engineer's Estimate and Backup Documentation (20 pages) <br /> • Appendix B: Contractor's Cost Submittal (4 pages) <br />
The URL can be used to link to this page
Your browser does not support the video tag.