Appendix A-Page 8
<br /> FDO "-.
<br /> �,.r Florida Department of Transportation
<br /> Item Average Unit Cost
<br /> From 2022/05/01 to 2022/10/31
<br /> Statewide
<br /> Contract Type: CC
<br /> Displaying: VALID ITEMS WITH HITS
<br /> From: 0102 1 To: 9999999
<br /> No. of Weighted Total Total Unit
<br /> Item Conts Average Amount Quantity Meas Obs? Description
<br /> 0641 3269 DEVICE,69'
<br /> 0641 3800 2 $10,404.27 $41,617.09 4.000 EA N CONCRETE CCTV POLE,COMPLETE POLE REMOVAL
<br /> 0643600 1 $2,500.00 $5,000.00 2.000 EA N STRAIN POLE,WOOD,REMOVE
<br /> anissaitsf1 11 58 2 304.71 $1,539,548.43 668.000 EA N ALUMINUM SIGNALS POLE,PEDESTAL
<br /> 0646 1 12 16 51,928.74 $225,662.82 117.000 EA N ALUMINUM SIGNALS POLE,FURNISH&INSTALL PEDESTRIAN DETECTOR
<br /> POST
<br /> 0646 1 40 5 $1,167.33 $19,844.60 17.000 EA N ALUMINUM SIGNALS POLE,RELOCATE
<br /> 0646 1 60 34 $389.26 $91,477.08 235.00) EA N ALUMINUM SIGNALS POLE,REMOVE
<br /> 0646 2115 2 $2,977.78 $26,800.00 9.00) EA N ALUMINUM POLE-INDEX 695-001,FURNISH&INSTALL,15'
<br /> 0649 1 11 1 $11,200.00 $112,000.00 10.00) EA N STEEL STRAIN POLE,F&I,TYPE PS- IV
<br /> 0649 1 13 1 $62,000.00 $186,000.00 3.00) EA N STEEL STRAIN POLE,F&I,TYPE PS- VI
<br /> 0649 1 14 1 $65,573.83 $262,295.32 4.00) EA N STEEL STRAIN POLE,FBI,TYPE PS- VII
<br /> 0649 1 16 1 $67,501.34 $270,005.36 4.00) EA N STEEL STRAIN POLE,F&I,TYPE PS-IX
<br /> 0649 1 63 1 $3,800.00 $15,200.00 4.00) EA N STEEL STRAIN POLE, REMOVE,SHALLOW FOUNDATION REMOVAL, BOLT
<br /> ON ATTACI IMENT
<br /> 0649 1 65 2 $8,292.97 $58,050.80 7.000 EA N STEEL STRAIN POLE, REMOVE,DEEP FOUNDATION R:MOVAL,BOLT ON
<br /> ATTACHMENT
<br /> 0649 2155 2 550,750.00 $406,000.00 8.000 EA N STEEL CCTV POLE, FURNISH ft INSTALL WITH LOWERING DEVICE,55'
<br /> 0649 2170 1 $95,000.00 $380,000.00 4.000 EA N STEEL CCTV POLE, FURNISH&INSTALL WITH LOWERING DEVICE,70'
<br /> 0649 2603 1 $4,500.00 $9,000.00 2.000 EA N STEEL CCTV POLE,REMOVE POLE-SHALLOW FOUNDATION REMOVAL,
<br /> BOLT ON ATTACHMENT
<br /> 11/28/2022 Page: 44
<br />
|