Laserfiche WebLink
Appendix A-Page 9 <br /> FDO <br /> Florida Department of Transportation <br /> Item Average Unit Cost <br /> From 2022/05/01 to 2022/10/31 <br /> Statewide <br /> Contract Type: CC <br /> Displaying: VALID ITEMS WITH HITS <br /> From: 0102 1 To: 9999999 <br /> No. of Weighted Total Total Unit <br /> Item Conts Average Amount Quantity Meas Obs? Description <br /> 0649 2605 1 $10,000.00 $10,000.00 1.000 EA N STEEL CCTV POLE,REMOVE POLE-COMPLETE/DEEP FOUNDATION <br /> REMOVAL, BOLT ON ATTACHMENT <br /> 0649 21 1 10 $57,603.98 $921,663.62 16.000 EA N STEEL MAST ARM ASSEMBLY,FURNISH AND INSTALL,SINGLE ARM 30' <br /> 0649 21 2 1 $109,000.00 $109,000.00 1.000 EA N STEEL MAST ARM ASSEMBLY,FURNISH AND INSTALL,DOUBLE ARM <br /> 30'-30' <br /> 0649 21 3 11 $71,486.75 $1,286,761.50 18.000 EA N STEEL MAST ARM ASSEMBLY,FURNISH AND INSTALL,SINGLE ARM 40' <br /> 0649 21 5 3 $84,032.82 $420,164.08 5.000 EA N STEEL MAST ARM ASSEMBLY,FURNISH AND INSTALL,DOUBLE ARM <br /> 40'-40' <br /> 0649 21 6 18 $73,377.51 $2,568,212.73 35.000 EA N STEEL MAST ARM ASSEMBLY, FURNISH/ND INSTALL,SINGLE ARM 50' <br /> 0649 21 8 1 $66,511.7 $66.511.47 1.000 EA N STEEL MAST ARM ASSEMBLY,FURNISH AND INSTALL,DOUBLE ARM <br /> 50'•40' <br /> 0649 21 9 1 $91,130.00 $91,130.00 1.000 EA N STEEL MAST ARM ASSEMBLY,FURNISH AND INSTALL,DOUBLE ARM <br /> 50'-50' <br /> 0649 21 10 18 $83,661.63 $2,677.172.21 32.000 EA N STEEL MAST ARM ASSEMBLY,FURNISH AND INSTALL,SINGLE ARM 60' <br /> 0649 21 11 1 $77,800.00 $77.800.00 1.000 EA N STEEL MAST ARM ASSEMBLY,FURNISH AND INSTALL,DOUBLE ARM <br /> 60%30' <br /> 0649 21 13 1 $115,000.00 $115,000.00 1.000 EA N STEEL MAST ARM ASSEMBLY,FURNISH AND INSTALL,DOUBLE ARM <br /> 60'-50' <br /> 0649 21 14 1 $90,660.00 $90.660.00 1.000 EA N STEEL MAST ARM ASSEMBLY, FURNISI I AND INSTALL,DOUBLE ARM <br /> 60'-60' <br /> 0649 21 15 21 $93,040.22 $3,721,608.74 40.000 EA N STEEL MAST ARM ASSEMBLY,FURNISH AND INSTALL,SINGLE ARM 70' <br /> 11/28/2022 Page: 45 <br />