Laserfiche WebLink
Table 4 <br />BUDGET ESTIMATE <br />PHASE 2 - LINER INSTALLATION FOR CELL 3 CONSTRUCTION AMENDMENT #2 <br />CLASS I LANDFILL - SEGMENT 3 EXPANSION <br />INDIAN RIVER COUNTY, FLORIDA <br />PHASE 8: MISCELLANEOUS ENGINEERING SUPPORT SERVICES <br />ITEM <br />BASIS <br />RATE <br />QUANTITY <br />ESTIMATED <br />COST <br />A. <br />Professional Services <br />a. Senior Principal <br />Hr <br />$294.00 <br />7 <br />$2,058.00 <br />b. Principal <br />Hr <br />$274.00 <br />0 <br />$0.00 <br />c. Senior Professional <br />Hr <br />$254.00 <br />0 <br />$0.00 <br />d. Project Professional <br />Hr <br />$224.00 <br />10 <br />$2,240.00 <br />e. Professional <br />Hr <br />$198.00 <br />16 <br />$3,168.00 <br />f. Senior Staff Professional <br />Hr <br />$178.00 <br />10 <br />$1,780.00 <br />g. Staff Professional <br />Hr <br />$154.00 <br />0 <br />$0.00 <br />Subtotal Professional Services <br />$9,246.00 <br />B. <br />Technical/Administrative Services <br />a. Site Manager/Construction Manager Hr <br />$142.00 <br />0 <br />$0.00 <br />b. Senior Engineering Technician <br />Hr <br />$99.00 <br />0 <br />$0.00 <br />c. Engineering Technician <br />Hr <br />$83.00 <br />0 <br />$0.00 <br />d. Senior Designer <br />Hr <br />$190.00 <br />10 <br />$1,900.00 <br />e. Designer <br />Hr <br />$160.00 <br />0 <br />$0.00 <br />f. Senior Drafter/Senior CADD Operator <br />Hr <br />$145.00 <br />0 <br />$0.00 <br />g. Project Administrator <br />Hr <br />$85.00 <br />0 <br />$0.00 <br />h. Clerical <br />Hr <br />$65.00 <br />0 <br />$0.00 <br />Subtotal Technical/Administrative Services <br />$1,900.00 <br />C. <br />Indirect Expenses <br />a. Subcontractor Services <br />Each <br />$0.00 <br />1 1.12 <br />$0.00 <br />Subcontractor Services <br />$0.00 <br />D. <br />Direct Expenses <br />a. Lodging <br />Da <br />$150.00 <br />0 <br />$0.00 <br />b. Per Diem <br />Da <br />$55.00 <br />0 <br />$0.00 <br />c. Communications Fee <br />3% Labor <br />$0.03 <br />$11,146 <br />$334.38 <br />d. CADD Computer System <br />Hr <br />$15.00 <br />10 <br />$150.00 <br />e. Vehicle Rental & Fuel <br />Da <br />$150.00 <br />0 <br />$0.00 <br />f. 8"x11" Photocopies <br />Each <br />$0.09 <br />0 <br />$0.00 <br />g. CADD Drawings <br />Each <br />$3.00 <br />0 <br />$0.00 <br />Subtotal Reimbursables <br />$484.38 <br />TOTAL ESTIMATED BUDGET: PHASE 8 <br />$11,.630.38 <br />