My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/1/1996
CBCC
>
Meetings
>
1990's
>
1996
>
10/1/1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:05:51 PM
Creation date
6/17/2015 8:50:04 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
10/01/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOOK 99 ME 293 <br />W oVIRAM <br />POLES SET INTO CONCRETE AS PER FABRICATED CABINET OUT OF <br />ENGINEERS DRAWING. OTHERS WILL .Oso ALUM. WITH ROUTED FACES <br />BLOCK AROUND POLES TO MATCH BUILDING BACKED WITH FLEX SURFACE <br />WILL HAVE A SPRAYED ON TEXTURE J=RIDA <br />FINISH. NET INTERNALLY �$ <br />WALVERO ILLUMINATED. UM/TBD <br />Chairman Adams questioned how 53rd Avenue relates to the road <br />east of Wal-Mart, and Director Boling showed a graphic of 53rd <br />Avenue and the existing driveway where there will be some <br />modification that will line up with the driveway on the opposite <br />side of SR -60. It is staff Is opinion that there could be an <br />increase in cut through traffic on 53rd Avenue since it is a <br />straight shot from 26th Street to SR -60. Wal-Mart has proposed to <br />put a signal there, which could benefit people on 53rd but could <br />contribute to cut-through=traffic unless traffic calming is used. <br />Traffic calming is where you make it a bit inconvenient for through <br />50 <br />OCTOBER 1, 1996 <br />
The URL can be used to link to this page
Your browser does not support the video tag.