My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-251
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-251
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2024 3:08:28 PM
Creation date
10/21/2024 2:50:22 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
09/24/2024
Control Number
2024-251
Agenda Item Number
15.B.1.
Entity Name
SCS Field Services
Subject
First Amendment to Agreement for Landfill Gas Flare Station and Piping
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental <br />Consulting & Contracting <br />September 6, 2024 <br />Himanshu Mehta <br />Managing Director <br />Indian River County - Solid Waste Disposal District <br />1325 74th Avenue SW <br />Vero Beach, FL 32968 <br />Subject: Proposal to Install Flare Station Electrical Service and Equipment <br />Indian River County Landfill, Vero Beach, Florida <br />Dear Mr. Mehta: <br />SCS Field Services (SCS -FS) is pleased to provide this proposal to the Solid Waste Disposal District <br />(SWDD) for the subject work. SCS -FS is prepared to schedule work and purchase materials upon <br />receipt of your approval. A summary of the scope of work, assumptions, and cost is outlined below <br />based on design drawings, parts list, and specifications provided by Bio Gas Engineering (BGE). <br />SCOPE OF WORK <br />SCS -FS and our sub -contractor, Onsite Electric (Onsite), will provide labor, equipment and materials <br />for the installation of electric service and conduit to the new flare station skid and control panels <br />based on the specifications provided by BGE/Kupper Engineering, LLC. dated September 8, 2023. <br />The scope of work includes the following: <br />• Install all new service and switch equipment. <br />• Trench and backfill all underground conduit and stub -ups. <br />• Pull and terminate wiring to control panels and instrumentation. <br />• Install concrete pad for transformer. <br />General Notes: <br />• Conduit C -05C04 this conduit and fiber was established that it will be done by others. <br />• Conduit C-04C0l Onsite will provide all the conduit, pull wire, and terminate but the TYPE K <br />is provided by others. <br />• No fiber termination or any networking from RNG to flare skid controller. <br />• Tray cable was established that it will be installed by blower skid manufacturer and will be <br />terminated. <br />• It was established that conduit spacers or duct bank is not needed and engineer will revise <br />drawings. <br />ASSUMPTIONS <br />The scope of work is based on the following assumptions: <br />Electrical permits is not included in the scope of work. <br />As built survey is not included in the scope of work. <br />1800 Pembrook Dr., Suite 300, Orlando, Florida 32810 iJ <br />
The URL can be used to link to this page
Your browser does not support the video tag.