My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-251
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-251
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2024 3:08:28 PM
Creation date
10/21/2024 2:50:22 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
09/24/2024
Control Number
2024-251
Agenda Item Number
15.B.1.
Entity Name
SCS Field Services
Subject
First Amendment to Agreement for Landfill Gas Flare Station and Piping
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu Mehta <br />September 3, 2024 <br />Page 2 <br />All submittals are to be approved by electrical design engineer prior to ordering materials. The estimated <br />lead time for materials is 20 to 24 weeks from notice to proceed. <br />ASSUMPTIONS <br />The scope of work is based on the following assumptions: <br />• Only the items listed above are included in this quote. If further work is requested it will be <br />completed at a separate time and material rate. <br />• Electrical permits if required are included in the scope of work. <br />• SCS -FS does not provide performance guarantees or warranties on equipment that SCS -FS did <br />not purchase. Warranties for equipment supplied by SCS -FS are based on the manufacturer's <br />terms and conditions. <br />• At a minimum, SCS -FS will have site access and permission to work Monday through Saturday <br />from 7:00 AM to 7:00 PM. <br />• The work area will be accessible and free of obstructions or other work activities performed by <br />others that could delay the installation process. <br />• SCS -FS may limit or restrict access to any and all traffic adjacent to the work area as needed. <br />• Additional change orders may be needed if changes to the scope of work are made after the date <br />of this proposal or if costs due to unforeseen circumstances exceed the contingency budget. <br />• Payment terms to SCS -FS will be per Florida Prompt Pay Act. <br />COMPENSATION AND SCHEDULE <br />SCS -FS can perform the scope of work described for a lump sum cost of $135,500.00. <br />Due to the significant expense of materials and long lead times for shipment, SCS -FS will require a 30% <br />down payment following approval of the electrical submittals by the electrical engineer and prior to <br />placement of the order. The remaining 70% will be invoiced to the County upon completion of the scope <br />of work. <br />30% Payment after electrical submittal approval: $40,650.00 <br />70% Payment upon completion of the scope of work: $94,850.00 <br />Total_Plice 4Q"135,500.00 <br />CLOSING <br />SCS -FS appreciates the opportunity to provide our proposal to Indian River County. If you have questions <br />or require additional information, please contact Brian Basconi at 401-486-4897. <br />Sincerely, <br />ti <br />Brian Basconi Garold (Tony) A. Cartee <br />Project Manager Regional Manager/ Vice President <br />SCS Field Services SCS Field Services <br />BB/GAC <br />
The URL can be used to link to this page
Your browser does not support the video tag.