My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/20/2024
CBCC
>
Meetings
>
2020's
>
2024
>
08/20/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 12:30:46 PM
Creation date
10/24/2024 10:57:20 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
08/20/2024
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
826
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2024 -0231 -PAA -EQ <br />DOCKET NO. 20240055 -EQ Attachment A <br />PAGE 13 Page 8 of 42 <br />Flectrielly Production and Plant Maintemnee Schedule <br />8.1 During the term of this Contract, no later than sixty(60) days and prior to Aprd I of each <br />calendar year thereafter, the QS shall submit to FPL in writing a detailed plan of, (a) the amount of firm capacity and energy to be generated <br />by the Facility and delivered to the Ddivery Pout for each amith oftin follovking calendar year. and (b) die time, duration and magnitude of <br />any scheduled maintenance period(s) and any anticipated reductions in capacity. <br />9,2 By October 31 ofeach calendar year, FPL A" nobly, the QS in wriWigwhether the "tc.stedsebedtdednuiMesiame pono(b <br />in the detailed plan are acceptable. if FPL objects to any of the regriested sd hetAded natintaruutce ptericxk, MAW] advise the QS of the tune <br />petimd closest to the requested period(s) when the outage(%) can be scheduled. The QS shall schedule maintenance outages only doing <br />periods approved by FPL, inch approval not unreasonably wide M& Once the schedule for mainteriance has been established and approval <br />by FPL, either Party may request a subsequent change in such schedule and, except when such event is due to Force Majeure, request <br />approval for such change from the other Party, such approval not to be unreasonably withheld or delayed Scheduled nu tuactiarica outage <br />days shall be limited to seven (7) clays iter calendar year witless the mritufacturer's recommendation of maintenance outage days for due <br />technology and equipment used by the Facility exceeds- such 7day period, provided, such number of days is considered reasonable by prudent <br />industry standards and dm not exceed two (2) fbinteen (14) day intervals, one in the Spring and one in the Fall, in any calendar year. <br />The scheduled maintenance outage days applicable for the QS are days in the Spring and days in the Full ofeach calendar <br />years Provided the conditions specified in the previous sentence are satisfied, lit no event shall inairdenance periods tis scheduled during die <br />following periods: Jame I through and including October 31st and December I through and including February 28 (or 20 as the me may <br />be) <br />S_3 The QS shall comply with reuionuble requests by FPI, regarding day-to-day and lour -by -hour communication between dw <br />Parties telAvi to electricity production grid maintenance scheduling. <br />8A Dispatch and Control <br />8A.1 *17he power supplied by the QS lierelinder shall be in the form of *00*.M 40 JW alternating current, at a rvamW <br />operating voltage of 000 volts i k and wwa factor dispato*& WA,aniAble in the range of 83% la9ft IV <br />SiVolcading as measured at the Delivery Poilit to maintain system operating paranwtW*vpsv"'*ffL. <br />11,41M&6m &dmilatmaoftho #W'qS WndoMwthe WW iA, as to M <br />I <br />convIiame Addli-A& law. and 00 <br />allsystcim <br />doing normal tesiftod"Mr. '1111014. WdW "A40W <br />accordance with good,i 10 PUGM A oit fi=fiorAb*iWA&lIW AM =2=9 <br />nubble, generator cc botlots W the tieft sW be provided to FPL WK, 10 $$%Oft ft VWW to, 1'* 1WSM orift V* <br />functional trip test will be condftnt with good engineering and operating I <br />&431fft Facility is separated from the FPL v 4W the QS Tommect the Puft <br />ystent for any wrier no drownstatu= I e <br />into FPL's system without first obi IWVs prior written approval. <br />SAA Who the tern of U& dwilract, the QS *AVOW M"d A Ilk ��Mix►tairur>g the <br />teanad - - --- milt .711. <br />facility and ft atomignating such M& M lfdke FtdW ho -a 41IMM that <br />operating pen rind 04 on duty at* **4 dityi F <br />C ormili ttw CW4* 4 " t tri-IllM *AM to fm envAl dart per <br />day fi*m 8 AkldW3 PMIW,bo *=*to Aft*& an It' ILI fidt $as chow <br />9-437ft dMa stA dm be excused fiona its a and *pUnunder, and FPL shall <br />2 3 -32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.