My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/20/2024
CBCC
>
Meetings
>
2020's
>
2024
>
08/20/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 12:30:46 PM
Creation date
10/24/2024 10:57:20 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
08/20/2024
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
826
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2024 -0231 -PAA -EQ <br />DOCKET NO. 20240055 -EQ <br />PAGE 14 <br />Attachment A <br />Page 9 of 42 <br />'Third Revised Sheet No. 9.036 <br />dial I not be wOW to peadre ac taeaeba M. <br />9W <br />v%* do* to qwdi" WPW*W"WsiIx*fW* 0*1 <br />which it Would hVW ilm dld=t 4jftV$ <br />I Oil$ <br />served is such tw AW ff on, m-bw tvad obak 6* OM&Xlu. 114111010 <br />additional -orgy —old terinkre taking a ban lood unit oirthe line ard $0 1 01 44 *4 saved by dart -Q* <br />generation. FPL shall give the QS as much prior notice as practicable afft 1vt W pwdaw or receive enter` <br />Pursuant to this Section. <br />8.431fthe Facility1w a Comraitted Capacity less than 75 MW, control, scheduling and dispatch of firm capacity and energy shall <br />he the responsibility of tate y& If the Facility hu it committed tapacity greater than or equal to 75 MW, then control, scheduling and <br />dispatch of firm capacity and energy shad be 0,W nipwisibility of the QS. Precept during a "Dispatch How", i.e„ any clock hour for which <br />FPL requests the delivery of such capacity aril WAW. Difing any Dispatch How. (a) cattrol of the Facility will either be by SUIer', <br />manual control tinder laic direction of FPL (whi0womfly tv in vnift or by Automatic Gcomfion Control by M's system control cera zi <br />as detarnined by FPL, and (b) FPL tuay req0W. ft Utiot p0MAXtput best any I" tip to the Committed Capacity of the rftcflity <br />puwi(Kinnoeverts sit ] FPL roqW=the rad .pester to be below the 14cilit3fxMinimum Load without decomutitting <br />the Facility, The Facility shall deliverer WwiftL____minuJvs, taMog into account the operatnnv <br />�& MJW,- I <br />limitations of the generating equipment A fl wfi6 foddeditch time period specified herein is considered roascvvible <br />by prudent industry standards for go" s6zed and assitming the Facility is opunting at or above its <br />18firtimum Load, Start-up tune fi*** qaw tttm5WWWWM"W^W 4VxWWMMf1f llme Rm Hot to Hot will be taken into consideranoo provided <br />such are reasonable and consistent with prudent fiAnWVw1ka jar IoU*ipdoffy mid equipment being utilized The Facility's Operating <br />Characteristics have been provided by the QS and smad"In AppoodkZ6 Section IV of Pate Schedule QS -2. <br />8.4.8 If the Facility has a Courtnitted Capacity oflesathan 13.14W, FPL may require diving certain lxn&xt�, by oral, written, or <br />electronic notifioaft to to Q 8 eerie d* *4W 0 .1 §oft 1Y$Wlq level below the Guti <br />ointted Capacity but not lower than the <br />Facility's Mirumum 1AxA VOL " provide a much mda w S "116. nonnally such notice will be of at least four (4) houts. Tlw <br />frequency of such request shall notmened d#AL= (14 dm per sidn A— year and the duration of each request shall not exceed four (I) <br />haus. <br />1 166 a Afty liability or pa}ule-nt obligjuoll �'11 dw N,[ I of FPI,. <br />including anyrJairn forwalacteaftioterfirl 4tuVwxmi*=W9Wh and fitirdedhW, <br />ComplefloWPerfarmance, Security <br />The security contemplated by this 8,60OR9 constitutes security for, bit is not a firnitation or, QS's obligations hereunder and hall <br />not be FPI:s exclusive vidwdy for Q$*& hilumilaperforto in accordance witli, <br />9.1 As woo* ft the a0dovamot of the tita—fted Capacity Delivery Date and satisfactory peTibruitunc of its obligation, <br />hereunder, the Q8 d4 Vwd&'FPL d6w (W) a aw=11tiona1, irrevocable, standby letter of credit(s) with an expiration &W no earlier <br />than the end,4111a do QsQ awd"MW at** 4p@* Delivery We (or the next 1xisiness day thereafter), imued by a U.S. comillercid <br />bank- or the UA bombeft kmipbe* it MAMMILof A- or higher by S&P or A3 or higher by MoMy's (a "Qualified Issuee);, <br />in farm and Map" ig <br />, partial and W draws mid (ii) permitting FPL to draw in full it <br />such letter oforekis not renewed or mWkad ampbottythe terms hereof at last dirty (30) business days prior to its expiration dated <br />("letter of Credit'); (b) a bond, issuodIM, 4 fiWW, Wi substance acceptable to Flil� <br />. OpWA Ctimparty acceptable to FM and in a form and substaric <br />("Bond'); or (c) a cash collateral deposited with FPL (10" Cdbftd') (-y of (a), ft or (c), the 'rompletionMerfmnarice Scourity'). <br />CompletionlPeftmance Security shall be provided it ftMWXtMAtY1ft, date listed below: <br />(a) 550.00 per kW (k the number 9f Wor Committat! Cape* ma WhIn 3"m 3,1) to to 4talivaWto M within in 0) <br />business days of the Effbctive Daw and <br />(b)S100.00 per kW (for die number of kW Is be Mwagftlntmy� <br />before the Ouanniectl Capacity Delivery Date. <br />'Credit means with , sp mllou.W <br />unsecured, senior long-term debtor —N d" esitIf 11 <br />rating agency or agencies or if such entity does not have a rating for its unsecured, senior long -tett <br />raft assigned to such entity as its 'coqxvatc credit rating' byS&P. <br />ny <br />Effective: June 5,2018 <br />23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.