My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-269A
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-269A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2024 11:59:31 AM
Creation date
11/12/2024 11:56:05 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
10/22/2024
Control Number
2024-269A
Agenda Item Number
8.D
Entity Name
Johnson-Davis Incorporated
Subject
Continuing Contract Agreement for Annual Utility Labor Services
Document Relationships
2024-266
(Agenda)
Path:
\Official Documents\2020's\2024
2024-267
(Agenda)
Path:
\Official Documents\2020's\2024
2024-268
(Agenda)
Path:
\Official Documents\2020's\2024
2024-269
(Agenda)
Path:
\Official Documents\2020's\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal Pricing Form RFP 202500 <br />Item No. <br />Unit <br />Material Unit <br />Price (Furnish <br />only) <br />Unit Price to <br />install only <br />Total Unit Price <br />(Furnish + <br />Installation) <br />Equipment Hourly Rates <br />3.8 -inch <br />EA <br />$ 500.00 <br />$ 4,500.00 <br />$ <br />5,000.00 <br />4.12 -inch <br />EA <br />$ 600.00 <br />$ 4,900.00 <br />$ <br />6,500.00 <br />(b) 40 -foot length <br />HR <br />$ <br />125.00 <br />(b) Combination Backhoe <br />HR <br />1.4 -inch <br />EA <br />$ 200.00 <br />$ 2,600.00 <br />$ <br />2,800.00 <br />86.00 <br />2.6 -inch <br />EA <br />$ 300.00 <br />$ 4,200.00 <br />$ <br />4,500.00 <br />(e) Dump Truck (9 CY) <br />3.8 -inch <br />EA <br />$ 500.00 <br />$ 5,300.00 <br />$ <br />5,800.00 <br />$ <br />4.12 -inch <br />EA <br />$ 600.00 <br />$ 7,400.00 <br />$ <br />8,000.00 <br />(c) 60 -foot length <br />HR <br />$ <br />35.00 <br />(i) Trash Pump 3" <br />HR <br />1.4 -inch <br />EA <br />$ 200.00 <br />$ 2,900.00 <br />$ <br />3,100.00 <br />15.00 <br />2.6 -inch <br />EA <br />$ 300.00 <br />$ 4,900.00 <br />$ <br />5,200.00 <br />(1) Gradall <br />3.8 -inch <br />EA <br />$ 600.00 <br />$ 6,000.00 <br />$ <br />6,600.00 <br />$ <br />4.12 -inch <br />EA <br />$ 1,000.00 <br />$ 8,500.00 <br />$ <br />9,500.00 <br />SECTION D - Time and Materials Rates (TO BE USED ON T&M ORDERS ONLY) <br />61 <br />Equipment Hourly Rates <br />(a) Trackhoe (specify model) <br />1. (medium) <br />HR <br />$ <br />90.00 <br />2. (large) <br />HR <br />$ <br />125.00 <br />(b) Combination Backhoe <br />HR <br />$ <br />80.00 <br />(c) Front end Loader <br />HR <br />$ <br />86.00 <br />(d) Grader <br />HR <br />$ <br />130.00 <br />(e) Dump Truck (9 CY) <br />HR <br />$ <br />70.00 <br />(f)Tandem Dump Truck (18 CY) <br />HR <br />$ <br />95.00 <br />(g) Forklift <br />HR <br />$ <br />90.00 <br />(h) Crew Truck with hand tools <br />HR <br />$ <br />35.00 <br />(i) Trash Pump 3" <br />HR <br />$ <br />15.00 <br />(j) Trash Pump 2" <br />HR <br />$ <br />15.00 <br />(k) Walk behind Vibrating Roller <br />HR <br />$ <br />16.00 <br />(1) Gradall <br />HR <br />$ <br />160.00 <br />(m) Roller <br />HR <br />$ <br />45.00 <br />(n) Cement Mixer <br />HR <br />$ <br />25.00 <br />(o) Box Blade <br />HR <br />$ <br />40.00 <br />(p) Water Truck <br />HR <br />$ <br />50.00 <br />(q) 1000 gpm sump pump <br />HR <br />$ <br />40.00 <br />D2 <br />Crew Hourly Rates <br />(a) Crew Man <br />HR <br />$ <br />50.00 <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.