Laserfiche WebLink
Proposal Pricing Form RFP 202500 <br />Item No. <br />Unit <br />Material Unit <br />Price (Furnish <br />only) <br />Unit Price to <br />install only <br />Total Unit Price <br />(Furnish + <br />Installation) <br />Equipment Hourly Rates <br />3.8 -inch <br />EA <br />$ 500.00 <br />$ 4,500.00 <br />$ <br />5,000.00 <br />4.12 -inch <br />EA <br />$ 600.00 <br />$ 4,900.00 <br />$ <br />6,500.00 <br />(b) 40 -foot length <br />HR <br />$ <br />125.00 <br />(b) Combination Backhoe <br />HR <br />1.4 -inch <br />EA <br />$ 200.00 <br />$ 2,600.00 <br />$ <br />2,800.00 <br />86.00 <br />2.6 -inch <br />EA <br />$ 300.00 <br />$ 4,200.00 <br />$ <br />4,500.00 <br />(e) Dump Truck (9 CY) <br />3.8 -inch <br />EA <br />$ 500.00 <br />$ 5,300.00 <br />$ <br />5,800.00 <br />$ <br />4.12 -inch <br />EA <br />$ 600.00 <br />$ 7,400.00 <br />$ <br />8,000.00 <br />(c) 60 -foot length <br />HR <br />$ <br />35.00 <br />(i) Trash Pump 3" <br />HR <br />1.4 -inch <br />EA <br />$ 200.00 <br />$ 2,900.00 <br />$ <br />3,100.00 <br />15.00 <br />2.6 -inch <br />EA <br />$ 300.00 <br />$ 4,900.00 <br />$ <br />5,200.00 <br />(1) Gradall <br />3.8 -inch <br />EA <br />$ 600.00 <br />$ 6,000.00 <br />$ <br />6,600.00 <br />$ <br />4.12 -inch <br />EA <br />$ 1,000.00 <br />$ 8,500.00 <br />$ <br />9,500.00 <br />SECTION D - Time and Materials Rates (TO BE USED ON T&M ORDERS ONLY) <br />61 <br />Equipment Hourly Rates <br />(a) Trackhoe (specify model) <br />1. (medium) <br />HR <br />$ <br />90.00 <br />2. (large) <br />HR <br />$ <br />125.00 <br />(b) Combination Backhoe <br />HR <br />$ <br />80.00 <br />(c) Front end Loader <br />HR <br />$ <br />86.00 <br />(d) Grader <br />HR <br />$ <br />130.00 <br />(e) Dump Truck (9 CY) <br />HR <br />$ <br />70.00 <br />(f)Tandem Dump Truck (18 CY) <br />HR <br />$ <br />95.00 <br />(g) Forklift <br />HR <br />$ <br />90.00 <br />(h) Crew Truck with hand tools <br />HR <br />$ <br />35.00 <br />(i) Trash Pump 3" <br />HR <br />$ <br />15.00 <br />(j) Trash Pump 2" <br />HR <br />$ <br />15.00 <br />(k) Walk behind Vibrating Roller <br />HR <br />$ <br />16.00 <br />(1) Gradall <br />HR <br />$ <br />160.00 <br />(m) Roller <br />HR <br />$ <br />45.00 <br />(n) Cement Mixer <br />HR <br />$ <br />25.00 <br />(o) Box Blade <br />HR <br />$ <br />40.00 <br />(p) Water Truck <br />HR <br />$ <br />50.00 <br />(q) 1000 gpm sump pump <br />HR <br />$ <br />40.00 <br />D2 <br />Crew Hourly Rates <br />(a) Crew Man <br />HR <br />$ <br />50.00 <br />11 <br />