My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-269A
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-269A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2024 11:59:31 AM
Creation date
11/12/2024 11:56:05 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
10/22/2024
Control Number
2024-269A
Agenda Item Number
8.D
Entity Name
Johnson-Davis Incorporated
Subject
Continuing Contract Agreement for Annual Utility Labor Services
Document Relationships
2024-266
(Agenda)
Path:
\Official Documents\2020's\2024
2024-267
(Agenda)
Path:
\Official Documents\2020's\2024
2024-268
(Agenda)
Path:
\Official Documents\2020's\2024
2024-269
(Agenda)
Path:
\Official Documents\2020's\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal Pricing Form RFP 202500 <br />Item No. <br />Unit <br />Material Unit Total Unit Price <br />Price (Furnish Unit Price to (Furnish + <br />only) Install only Installation) <br />(b) Foreman <br />HR <br />$ <br />75.00- <br />(c) 12 -inch Bypass Pumping Setup and Operation DAY $ 7,500.00 <br />(c) Supervisor <br />HR <br />$ <br />100.00 <br />(d) 3 man crew includes 1 supervisor <br />HR <br />$ <br />300.00- <br />(d) Duplex Motor Control Panel, 15 — 25 hp, Three Phase, 480 Volts w/ Soft Starts EA <br />(e) 4 man crew includes 1 supervisor <br />HR <br />$ <br />375.00 <br />E3 <br />(f) 5 man crew includes 1 supervisor <br />HR <br />$ <br />425.00 <br />D3 <br />Overtime Crew Hourly Rates <br />1. 4 -inch <br />EA <br />(a) Crew Man <br />HR <br />$ <br />75.00 <br />(b) Foreman <br />HR <br />$ <br />100.00 <br />(c) Supervisor <br />HR <br />$ <br />100.00 <br />(d) 3 man crew includes 1 supervisor <br />HR <br />$ <br />375.00- <br />(e) 4 man crew includes 1 supervisor <br />HR <br />$ <br />450.00 <br />(f) 5 man crew includes 1 supervisor <br />HR <br />$ <br />575.00 <br />D4 <br />Nightime Crew Hourly Rates <br />(a) Crew Man <br />HR <br />$ <br />75.00 <br />(b) Foreman <br />HR <br />$ <br />100.00 <br />(c) Supervisor <br />HR <br />$ <br />100.00- <br />(d) 3 man crew includes 1 supervisor <br />HR <br />$ <br />450.00 <br />(e) 4 man crew includes 1 supervisor <br />HR <br />$ <br />575.00 <br />(f) 5 man crew includes 1 supervisor <br />HR <br />$ <br />650.00 <br />Section E: Lift Station <br />E1 <br />Operational <br />(b) 4 -inch Bypass Pumping Setup and Operation DAY $ 2,500.00 <br />(c) 6 -inch Bypass Pumping Setup and Operation DAY $ 3,500.00 <br />(c) 12 -inch Bypass Pumping Setup and Operation DAY $ 7,500.00 <br />E2 <br />Electrical <br />(a) Duplex Motor Control Panel, 3 — 5 HP, Single Phase, 240 Volts EA <br />(b) Duplex Motor Control Panel, 3 —10 HP, Three Phase, 240 Volts EA <br />c Duplex Motor Control Panel, 5 —10 HP, Three Phase, 480 Volts EA <br />(d) Duplex Motor Control Panel, 15 — 25 hp, Three Phase, 480 Volts w/ Soft Starts EA <br />(e) Duplex Motor Control Panel, 30 —100 hp, Three Phase, 480 Volts w/Soft Starts EA <br />(f) Install Meter Can & Disconnect EA <br />E3 <br />Plug Valve <br />(a) Lever Operated, Flanged Joint (4 -inch) EA <br />(b) Hand Wheel, Flanged Joint <br />1. 4 -inch <br />EA <br />2. 6 -inch <br />EA <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.