Laserfiche WebLink
CHANGE ORDER NO. 1 <br />DESCRIPTION OF ITEMIZED CHANGES <br />PROJECT NAME: TRANS -FLORIDA RAILWAY TRAIL FROM FELLSM ERE TO WEST OF 1-95 <br />PROJECT NO. IRC -2115 BID NO. 2024006 <br />,.��• <br />� g- ,-� ass: --� <br />�.ti <br />14.25 <br />101 793.02 <br />285-704 <br />OPTIONAL BASE GROUP 4 6" CEMENTED COQUINA) (LBR 100 <br />rTN <br />7.143-37 <br />334-1-12 <br />SUPERPAV ASPHALT CONCRETE TRAFFIC B (TYPE SP -9.5 1.5" <br />34.74 <br />221.00 <br />7,677.54 <br />334-1-13B <br />SUPERPAVE ASPHALT CONCRETE TRAFFIC C(TYPE SP -12.6 1" <br />TN <br />4.06 <br />294.00 <br />1 193.64 <br />570-1-2 <br />PERFORMANCE TURF SOD MATCH EXISTING <br />SY <br />1,486.45 <br />4.00 <br />5 945.80 <br />INSTALL <br />WCD-2 ISTA <br />APPROX 0 - 6INCHES OF ASPHALT MILLINGS UNDER <br />TRAIL SUBGRADE TO RAISE TRAIL PROFILE FROM STA 112 TO <br />127 PPROX 1500 LF <br />LS <br />1 <br />22 482.81 <br />22 482.81 <br />WCD-3 <br />FURNISH, INSTALL AND GRADE ADD'L COQUINA BASE <br />MATERIAL FROM STA 68+37 TO STA 83 OR APPROX 1.460 LF <br />LS <br />38 127.00 <br />38 127.00 <br />WCD-4 <br />EXTEND PAVED TRAIL 19.58 LF WEST FROM STA 68+37.35 TO <br />ST 68+17.77 <br />LS <br />1 <br />4,631.00 <br />4 631.00 <br />WCD-5 1PROJECT <br />PAY CONTRACTOR FOR BOLLARDS NOT INSTALLED ON <br />PER QUOTE - NOWPARTICIPATING - iRC TO RECEIVE <br />LS <br />1 <br />7.040. <br />7,040.99 <br />CD -6 <br />F&I 14' GALVENIZED GATES W/3' WIDE PAVED PEDESTRIAN <br />ENTRANCES F&I PAVED APRONS F&I STONE APRONS <br />LS <br />1 <br />34 627.57 <br />34 527.57 <br />104-1 <br />ARTIFICIAL COVERINGSIEROSION CONTROL ABATEMENT <br />PRODUCTS <br />SY <br />1.724 <br />2.50 <br />4,310.00 <br />104-10.3 <br />DIM NT BARRIER <br />1 637 <br />6.75 <br />11 049.75 <br />104-15 <br />SOIL TRACKING PREVENTION DEVICE <br />HrY <br />1 <br />3,315.00 <br />3 315.00 <br />120-1 <br />REGULAR EXCAVATION <br />601.19 <br />29.00 <br />17,434.5l.....-- <br />7 434.51120-6 <br />120-6 <br />EMBANKMENT <br />25 <br />20.50 <br />512-50 <br />1604 <br />TYPE B STABILIZATION. 12 LBR40 <br />SY <br />13,100 <br />13.00 <br />170,300-00 <br />519-78 <br />BOLLARDS COLLAPSIBLE <br />EA <br />4 <br />2,016.00 <br />8,060.00 <br />999-25A <br />FORCE ACCOUNT <br />LS <br />1 <br />100 000.04 <br />100,000.00 <br />PAY APP 2115-9 ATTACHED AS BACKUP <br />SUBTOTALS <br />�A_T223,419.37 <br />314 981.76 <br />TRANS -FLORIDA RAILWAY TRAIL FROM FELLSMERE TO <br />WEST OF 1-95 TOTAL <br />$ 91,662.39 <br />1 <br />FAPub6c Wolk$1ENGINEERING DIVISION PROJECTS12115 Trane-Flo(Wa ftitmay Trai f o F.IW-,a to W of 185\t-AUmrMgwMa HarmlRrojecl Ct_s oiCmnp. Older B-WIRC-2115 COt EXCEL . FOOT <br />