Laserfiche WebLink
TRANS -FLORIDA RAR.WAY TRAIL FROM FELLSMERE TO WEST OF 1-95 <br />PAY APP NO 21154 <br />tafl=U-10131PA24 <br />FM 441071.141"l <br />SCHEDULED VALUE <br />PREVIOUS APPLICATION <br />THIS PERIOD <br />TOTAL COMPLETED <br />MATERIALS <br />% <br />BALANCE TO FINISH <br />Ne <br />UNIT <br />4TY <br />Unit Price <br />Amount <br />QUANTITY1 <br />Amount <br />QUANTIFY <br />Amount <br />QUANTITY <br />Amount <br />STORED <br />QUANTITY Amount <br />LS <br />1 <br />125,572.01 <br />125,572.01 <br />LW <br />325,57101 <br />0.00 <br />LOO <br />125572.01 <br />0.00 <br />100.00% <br />0.00 0.00 <br />101-1 <br />MOBILIZATION <br />LS <br />1 <br />2,700.00 <br />2,700.00 <br />LOO <br />2,700.00_; <br />0.00 <br />1.00 <br />2,700.00 <br />0.00 <br />100.00% <br />0.00 0.00 <br />102-1 <br />MAINTENANCE OF TRAFFIC <br />ARTIFICALCOVERINGS/ERDSION CONTROL ABATEMENT <br />SY <br />8,150 <br />2.50 <br />20,375.00 <br />6,426.00 <br />16,06S.00 <br />_ <br />0.00 <br />6,426.00 <br />16,065.00 <br />0.00 <br />78.651A <br />1,724.00 4,310.00 <br />104-1 IPRODLIM <br />LF <br />14,800 <br />6.75 <br />99,900.00 <br />33,163.00 <br />88,850.25 <br />0.00 <br />13,363.00 <br />88,850.25 <br />GAO <br />68.94% <br />1,637.00 11,049.75 <br />104.10-3 <br />SEDIMENT BARRIER <br />EA <br />2 <br />3,315.00 <br />6,630.00 <br />1.00 <br />3,315.00 <br />0.00 <br />1.00 <br />3,315.00 <br />0.00 <br />50.00% <br />1.00 3,313.00 <br />104-1S <br />SOIL TRACKING PREVENTION DEVICE <br />AC <br />S <br />12,129.00 <br />54,58050 <br />450 <br />S4,S80.500.00 <br />4.50 <br />54,580.50 <br />0.00 <br />100.00% <br />MOO 0.00 <br />110-1-1 <br />CLEARING 8, GRUBBING <br />CY <br />2,725 <br />29.00 <br />79,025.00 <br />2,123.81 <br />61,590.49!"c'..`' <br />0.00 <br />2,123.81 <br />61,590.49 <br />0.00 <br />77.94% <br />601.19 17,434.51 <br />120.1 <br />REGULAR EXCAVATION <br />CY <br />100 <br />20.50 <br />2,050.00 <br />75.00 <br />IS37.50 <br />0.00 <br />75.00 <br />1537.50 <br />0.00 <br />75.00% <br />25.00 51250 <br />120.6 <br />EMBANKMENT <br />SY <br />13,100 <br />13.00 <br />170,300.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00% <br />13,100.00 170,300.00 <br />160-4 <br />TYPE 8 STABILIZATION, 12' (LBR40) <br />OPTIONAL BASE GROUP 416" CEMENTED COQUINA) (EBR 300) <br />SY <br />10,500 <br />14.25 <br />149,625.00 <br />17,643.37 <br />251,418 02 <br />0.00 <br />17,643.370 <br />251,418.02 <br />O.DO <br />266.03%. j . <br />7,313.37 -101,793.02 <br />28S-704 <br />(Prr WWJr+rmm 21,950.8,7-.0x:2,450977 rMl-223.92!) <br />OPTIONAL BASE GROUP 6 (8" CEMENTED COQUINA) (LSR 100) <br />SY <br />202 <br />33.50 <br />6,767.00 <br />202.00 <br />6,767.00 <br />67.00 <br />202.00 <br />6,767.00 <br />0.00 <br />100.00% <br />0.110 0.00 <br />285-706 <br />(FPL EASEMENT AREA) <br />OPTIONAL BASE GROUP 11(12" CEMENTED COQUINA) (LSR <br />SY <br />143 <br />37,50 <br />S,362SO <br />143.00 <br />SX2.50 <br />O.DO <br />143.00 <br />5,362.50 <br />0.00 <br />100.00% <br />0.00 0.00 <br />285-711 <br />100) (FPL EASEMENT AREA) <br />TN <br />790 <br />221.00 <br />174,590.00 <br />824.74 <br />182,26754 <br />0.00 <br />824.74 <br />182,267.54 <br />0.00 <br />:104401*:=. <br />-34.74 -7,677.54 <br />334.1.12 <br />SUPERPAVE ASPHALT CONCRETE, TRAFFIC B (TYPE SP -9.5, I.S') <br />SUPERPAVE ASPHALT CONCRETE TRAFFIC C(TYPE SP -9.5,1') <br />TN <br />24 <br />294,00 <br />71056.00 <br />24.00 <br />7,056.00 <br />0.00 <br />24.00 <br />7,056.00 <br />0.00 <br />100.00% <br />0.00 D.00 <br />334-1-13A <br />(FPL EASEMENT) <br />SUPERPAVE ASPHALT CONCRETE TRAFFIC MPE SP -12.S, 1") <br />TN <br />3d <br />294.00 <br />9,996.00 <br />38.06 <br />11,189 64 <br />0.00 <br />38.06 <br />11,189.64 <br />0.00 <br />' Y23.94%., ,. <br />-4.06 -1,193.64 <br />334.3-13B <br />(FPI EASEMENT) <br />LF <br />24 <br />141.00 <br />3,384.00 <br />24.00 <br />3,384.00 <br />0.00 <br />24.00 <br />3,184.00 <br />0.00 <br />300.00% <br />0.00 0.00 <br />430-175-115 <br />PIPE CULVERT, OPTIONAL MATERIAL, ROUND. 15' S/CD (RCP) <br />LF <br />80 <br />17100 <br />13,760.00 <br />80.00 <br />13,760.00 <br />0.00 <br />80.00 <br />13,760.00 <br />0.00 <br />100.00% <br />0.00 0.00 <br />430.175 -124 <br />PIPE CULVERT, OPTIONAL MATERIAL, ROUND 24' S/CD (RCP) <br />PIPE CULVERT, OPTIONAL MATERIAL, ROUND I9"X30' S/CO <br />LF <br />40 <br />208.50 <br />8,340.00 <br />40.00 <br />8,340.00 <br />�^ li. :' �: <br />0.00 <br />40.00 <br />8,340.00 <br />0.00 <br />100.00% <br />0.00 0.00 <br />430-17S-224 <br />SY <br />6,450 <br />4.00 <br />2S,SW.00 <br />7,936.45 <br />31,745.80 <br />0.00 <br />7,936AS <br />31,745.80 <br />0.00 <br />126 091E <br />-1,486.45 -5,945.80 <br />570.1-2 <br />PERFORMANCE TURF, 500 (MATCH EXISTING) <br />AS <br />2 <br />450.00 <br />900.00 <br />2.00 <br />900AG <br />.� •-%:: <br />0.00 <br />2.00 <br />900.00 <br />DAD <br />100.00% <br />0.00 0.00 <br />71X7-1-11 <br />SCRUB JAY SIGNAGE (INSTALLATION ONLY) <br />AS <br />1 <br />725.00 <br />725.00 <br />LW <br />72S.000.000.00100.00%0.00 <br />LW <br />725.00 <br />0.00 0.00 <br />700.1.11A <br />SINGLE POST SIGN, UP TO 12 SF <br />EA <br />4 <br />2,015.00 <br />8,060.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00% <br />d.00 8,060.00 <br />519.78 <br />BOLLARDS (COLLAPM! <br />D <br />.ASAtI�.TSUII(!1YR16:AN7BE'�dI10bRAVEl1N6P11EPARATION{6Y <br />:.s <br />'� <br />.-.r.LOO �� <br />12;000.99 <br />.QAC <br />�I00.00% <br />`. 0.00, <br />997,499.00 <br />0.00 <br />893.62700 <br />5500.25 <br />�. <br />O.DO <br />899,127.24 <br />0.00 <br />90.14% <br />0.00 98,371.76 <br />SUBTOTAL:; <br />_.. <br />»...,.._......_:..... 7777== <br />