My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-289
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-289
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2025 12:05:37 PM
Creation date
12/19/2024 10:44:26 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
11/05/2024
Control Number
2024-289
Agenda Item Number
15.B.2.
Entity Name
SCS Field Services
Subject
Agreement for Landfill Gas Wellfield Expansion
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu Mehta <br />October 18,•2024 <br />Page 2 <br />• Each new well will be equipped with an 8 -inch dual extraction QED well cap. Wellheads that <br />were removed from abandoned wells will be installed on the seven replacement wells and <br />three new vertical wells. <br />• Three new QED AP -4 plus pumps, fittings, and hardware will be installed in the three new <br />vertical wells. Existing pumps that were removed from the abandoned wells will be installed in <br />the seven replacement wells. <br />• Vertical well spoils will be transported to the active work face by SCS -FS. <br />Task Two: HDPE Vacuum Lateral, Air and Forcemain Piping Installation <br />SCS -FS will provide labor equipment and materials to install new HDPE vacuum lateral (SDR -17), air (SDR - <br />9) and forcemain (SDR -11) piping based on the following scope of work description: <br />• Install 280 feet of 6 -inch vacuum lateral, 2 -inch air and 3 -inch forcemain piping from well EW - <br />39 to replacement well EW -56R and tie into the existing piping at EW -55. <br />• Install 360 feet of 6 -inch vacuum lateral, 2 -inch air and 3 -inch force main piping from well EW - <br />40 to well EW -42. <br />• Install the 18 -inch valve that was removed at location ZV-21. Install 560 feet of 18 -inch <br />vacuum lateral, 2 -inch air and 3 -inch force main piping from ZV-21 to the tie in location at SC - <br />5. Vacuum, air and forcemain risers will be installed at replacement wells EW -69, EW -70 and <br />side.slope collectors SC -3 and SC -4. <br />• Install the 24 -inch valve that was removed at location ZV-20. Install 160 feet of 24 -inch <br />vacuum lateral, 2 -inch air and 3 -inch forcemain piping from valve ZV-20 to downslope of SC -1. <br />The 24 -inch vacuum lateral will terminate with a blind flange for future lateral piping. A 24 - <br />inch by 8 -inch tee will be installed prior to the blind flange. <br />• Install 880 feet of 8 -inch vacuum lateral, 2 -inch air, and 3 -inch forcemain piping to side slope <br />collectors SC -1, SC -2, replacement well EW -72 and new wells EW -2401, EW -2402 and EW - <br />2403. <br />Clean fill will be backfilled around all piping. Trench spoils that cannot be backfilled will be <br />transported to the active working face by SCS -FS. <br />ASSUMPTIONS <br />The -scope of work is based on the following assumptions: <br />• At a minimum, SCS -FS will have site access and permission to work Monday through Saturday <br />from*7:00 AM to 7:00 PM. <br />• The scope of work is based on one drill rig mobilization and demobilization. If additional <br />mobilizations are needed there will be an additional cost based on the fee schedule. <br />• Scope of work does not include new include new wellheads. Additional wellheads will be charged <br />based on the fee schedule. <br />• • Piping installation quantities are approximate and may vary. <br />• The work area will be accessible and free of obstructions or other work activities performed by <br />others that could delay the installation process. <br />• SCS -FS may limit or restrict access to any and all traffic adjacent to the work area as needed. <br />• Any additional drug testing or personnel background requirements to work for this project - those <br />costs need to be passed through. Also, consider the time it takes to perform these checks/tests. <br />• Additional change orders may be needed if changes to the scope of work are made after the date <br />of this proposal or if costs due to unforeseen circumstances. <br />• Payment terms to SCS -FS will be NET 30 or less. <br />
The URL can be used to link to this page
Your browser does not support the video tag.