My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-289
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-289
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2024 10:48:00 AM
Creation date
12/19/2024 10:44:26 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
11/05/2024
Control Number
2024-289
Agenda Item Number
15.B.2.
Entity Name
SCS Field Services
Subject
Agreement for Landfill Gas Wellfield Expansion
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental <br />Consulting & Contracting <br />October 18, 2024 <br />Himanshu Mehta <br />Managing Director <br />Indian River County - Solid Waste Disposal District <br />1325 74th Avenue SW <br />Vero Beach, FL 32968 ° <br />Subject: Proposal to Install Vertical Wells and HDPE Vacuum, Air and Forcemain Piping <br />Indian River Landfill, Vero Beach, Florida <br />Dear Mr. Mehta: <br />SCS Field Services (SCS -FS) is pleased to provide this proposal to you for the subject work based on <br />discussions between SCS -FS and Indian River County (County). SCS -FS is prepared to s°chedule the work <br />following approval by the County. A summary of the scope of work and cost is outlined below. <br />BACKGROUND <br />In September 2024, SCS -FS abandoned eight vertical wells, along with the vacuum lateral'piping, air <br />piping, and forcemain piping, due to a sliver fill on the north slope of Cells 1 and 2 in Segment 3 of the <br />landfill. At the County's request, once the sliver fill is completed by operations, SCS -FS will install eight <br />new vertical wells on the north slope of Cells 1 and 2. New vacuum lateral piping, air°piping, 'and <br />forcemain piping will also be installed for each of these wells. Additionally, vacuum lateral piping will be <br />connected to the seven side slope collectors that were left in place. To account for the 20-30 feet of <br />additional waste placed in Cell 2, two new vertical wells will be installed to replace wells EW -179 and EW- . <br />177. <br />SCOPE OF WORK <br />Task One: Vertical Well Installation <br />SCS -FS will provide labor equipment and materials to install new vertical wells based' on the following <br />scope of work description: <br />• One mobilization and demobilization of Recovery Drilling Services. <br />• Drilling 1,015 vertical feet to install seven replacement wells: EW -41, EW -56R, EW -69, EW -70,, <br />EW -72R, EW -177, EW -179, and three new vertical wells: EW -2401, EW -2402 and EW -2403 <br />based on Figure 1. SCS -FS does not recommend installing replacement,wells EW -68, EW -71' <br />and EW -74 at this time due to shallow waste depths. The well schedule is' presented in Table <br />1. <br />• Installation of 816 feet of 8 -inch schedule 80 perforated PVC pipe. Perforated pipe will be. <br />backfilled with #4 non calcareous stone. A geocomposite ring and bentonite seal°will be <br />installed on top of the stone. <br />• Installation of 250 feet of 8 -inch schedule 80 solid PVC pipe. Solid pipe will consist of 20 feet <br />below grade and 5 feet above grade. Below grade pipe will be backfilled with clean fill <br />material. <br />1800 Pembrook Drive, Suite 300, Orlando, Florida 32810 p <br />
The URL can be used to link to this page
Your browser does not support the video tag.