Laserfiche WebLink
Environmental <br />Consulting & Contracting <br />October 18, 2024 <br />Himanshu Mehta <br />Managing Director <br />Indian River County - Solid Waste Disposal District <br />1325 74th Avenue SW <br />Vero Beach, FL 32968 ° <br />Subject: Proposal to Install Vertical Wells and HDPE Vacuum, Air and Forcemain Piping <br />Indian River Landfill, Vero Beach, Florida <br />Dear Mr. Mehta: <br />SCS Field Services (SCS -FS) is pleased to provide this proposal to you for the subject work based on <br />discussions between SCS -FS and Indian River County (County). SCS -FS is prepared to s°chedule the work <br />following approval by the County. A summary of the scope of work and cost is outlined below. <br />BACKGROUND <br />In September 2024, SCS -FS abandoned eight vertical wells, along with the vacuum lateral'piping, air <br />piping, and forcemain piping, due to a sliver fill on the north slope of Cells 1 and 2 in Segment 3 of the <br />landfill. At the County's request, once the sliver fill is completed by operations, SCS -FS will install eight <br />new vertical wells on the north slope of Cells 1 and 2. New vacuum lateral piping, air°piping, 'and <br />forcemain piping will also be installed for each of these wells. Additionally, vacuum lateral piping will be <br />connected to the seven side slope collectors that were left in place. To account for the 20-30 feet of <br />additional waste placed in Cell 2, two new vertical wells will be installed to replace wells EW -179 and EW- . <br />177. <br />SCOPE OF WORK <br />Task One: Vertical Well Installation <br />SCS -FS will provide labor equipment and materials to install new vertical wells based' on the following <br />scope of work description: <br />• One mobilization and demobilization of Recovery Drilling Services. <br />• Drilling 1,015 vertical feet to install seven replacement wells: EW -41, EW -56R, EW -69, EW -70,, <br />EW -72R, EW -177, EW -179, and three new vertical wells: EW -2401, EW -2402 and EW -2403 <br />based on Figure 1. SCS -FS does not recommend installing replacement,wells EW -68, EW -71' <br />and EW -74 at this time due to shallow waste depths. The well schedule is' presented in Table <br />1. <br />• Installation of 816 feet of 8 -inch schedule 80 perforated PVC pipe. Perforated pipe will be. <br />backfilled with #4 non calcareous stone. A geocomposite ring and bentonite seal°will be <br />installed on top of the stone. <br />• Installation of 250 feet of 8 -inch schedule 80 solid PVC pipe. Solid pipe will consist of 20 feet <br />below grade and 5 feet above grade. Below grade pipe will be backfilled with clean fill <br />material. <br />1800 Pembrook Drive, Suite 300, Orlando, Florida 32810 p <br />