ITEMIZED BID SCHEDULE
<br />43RD AVE. BICYCLCE AND PEDESTRIAN IMPROVEMENTS - 14TH LANE & 15TH PLACE RESURFACING
<br />PROJECT NO. IRC -1818A BID NO. 2025008
<br />BIDDER'S Name:
<br />Item No.
<br />Description _____jF_Un11tIT
<br />Quantity I Unit Price
<br />Amount
<br />101-1
<br />MOBILIZATION/DEMOBILIZATION
<br />LS
<br />1
<br />$54,489.41
<br />$ 54,489.41
<br />102-1
<br />MAINTENANCE OF TRAFFIC
<br />LS
<br />1
<br />$24,295.87
<br />$ 24,295.87
<br />104-2
<br />PREVENTION CONTROL & ABATEMENT OF EROSION & WATER POLLUTION
<br />LS
<br />1
<br />$2.127.56
<br />$ 2,127.56
<br />110-1-1A
<br />CLEARING AND GRUBBING (RIGHT-OF-WAY)
<br />LS
<br />1
<br />$10,342.99
<br />$ 16,342.99
<br />110-1-I8
<br />CLEARING, TREEAND STUMP REMOVAL DRAINAGE EASEMENT)
<br />LS
<br />1
<br />$9,125.07
<br />$9,125.07
<br />110.7-1
<br />MAILBOX REMOVE AND RESET, SINGLE
<br />EA
<br />10
<br />$230.46
<br />$ 2,304.60
<br />110-23
<br />TREE & STUMP REMOVAL RIGHT-OF-WAY)
<br />EA
<br />2
<br />$2,660.46
<br />$ 5,320.92
<br />120-1
<br />REGULAR EXCAVATION
<br />CY
<br />so
<br />$29.17
<br />$ 2,333.60
<br />120-6
<br />EMBANKMENT
<br />CY
<br />90
<br />$36.89
<br />$ 2,951.20
<br />283-1
<br />ASPHALT EMULSION TYPE CSS -1H
<br />GAL
<br />2,240
<br />$4.02
<br />$9,004.80
<br />283-2
<br />PORTLAND CEMENT TYPE 1
<br />TN
<br />12
<br />$298.74
<br />$ 3,584.88
<br />283-7
<br />FULL DEPTH RECLAMATION (10" MIXING DEPTH)
<br />SY
<br />1,120
<br />$27.98
<br />$ 31,337.60
<br />285-704
<br />OPTIONAL BASE GROUP 4 -(CEMENTED COQUINA, LBR-100,6")
<br />SY
<br />1,300
<br />$25.15
<br />$32,695.00
<br />286-2
<br />REPLACE ASPHALT DRIVEWAY (1-1/2" SP -9.5 ASPHALT CONCRETE)
<br />Sy
<br />70
<br />$58.08
<br />$ 4,065.60
<br />334-1-S3
<br />SUPERPAVEASPHALT CONCRETE SP -9.5) RAFFICC PG76-22)(1-1/2")
<br />TON
<br />100
<br />$281.53
<br />$28,153.00
<br />430-94-1
<br />CLEAR AND DESILT DRAINAGE PIPE, 0-24"
<br />LF
<br />22
<br />$18.93
<br />$ 416.46
<br />430-94-2
<br />CLEAR AND DESILT DRAINAGE PIPE 25-36"
<br />LF
<br />6
<br />$27.84
<br />$ 167.04
<br />43D-175-115
<br />PIPE CULVERT, ROUND, 15" 5/CD (POLYPROPYLENE)
<br />LF
<br />20.00
<br />$151.31
<br />$ 3,026.20
<br />520.1
<br />CONCRETE FLUME
<br />EA
<br />2
<br />$1,536.13
<br />$ 3,072.26
<br />520-3
<br />CONCRETE VALLEY GUTTER 2' WIDE, 3000 PSI MIN.
<br />LF
<br />775
<br />$33.77
<br />$ 26,171.75
<br />522-2
<br />REPLACE CONCRETE DRIVEWAY (6" THICK 3000 PSI MIN.)
<br />SY
<br />135
<br />$91.84
<br />$ 12,398.40
<br />526-1-101
<br />REMOVE AND REPLACE BRICK PAVERS
<br />SF
<br />98
<br />$11.48
<br />$ 1,125.04
<br />530-3-4
<br />RIPRAP RUBBLE, F&I, CULVERT INSTALLATION
<br />TN
<br />6
<br />$244.59
<br />$ 1,467.54
<br />570-1-1A
<br />PERFORMANCE TURF SOD BAHIA)
<br />Sy
<br />800
<br />$5.42
<br />$4,336.00
<br />570-1-1B
<br />PERFORMANCE TURF (SOD)(ST.AUGUSTINE)
<br />SY
<br />600
<br />$7'37
<br />$4,422.00
<br />706-1-3
<br />RAISED PAVEMENT MARKERS, TYPE
<br />EA
<br />12
<br />$11.14
<br />$133.68
<br />711-11-221
<br />THERMOPLASTIC, STANDARD, YELLOW, SOLID, 6"
<br />LF
<br />200
<br />$10.58
<br />$ 2,116.00
<br />999-1
<br />AS -BUILT SURVEYING AND RECORD DRAWING PREPARATION (BY REGISTERED
<br />SURVEYOR
<br />Ls
<br />1
<br />$7,819.17
<br />$ 7,819.17
<br />SUB -TOTAL=
<br />$ 288,803.64
<br />999-25A
<br />FORCE ACCOUNT=
<br />$100,000.00
<br />TOTAL PROJECT BID AMOUNT (INCLUDING FORCE ACCOUNTS) =
<br />$ 388,803.64
<br />LS=Lump Sum GAL=Gallon EA=Each CY=Cubic Yard SY=Square Yard TN=Ton LF=Llnear Foot SF=Square Foot
<br />NOTE: IF THERE IS A DISCREPANCY BETWEEN THE PLANS (SUMMARY OF PAY ITEMS) AND THE ITEMIZED BID SCHEDULE THE BID SCHEDULE WILL BE UTILIZED FOR BIDDING
<br />PURPOSES.
<br />TOTAL PROJECT BID AMOUNT IN WORDS
<br />Three Hundred Eighty -Eight Thousand Eight Hundred Three Dollars and Sixty -Four Cents.
<br />00310-3
<br />FAPublic WorkstENGINEERING DIVISION PROJECTS\t818A 14th Ln & 15th PI ResurfacingkI-AdminVMs0d Documents)MASTER ITEMIZED BID SCHEDULE
<br />
|