Laserfiche WebLink
ITEMIZED BID SCHEDULE <br />43RD AVE. BICYCLCE AND PEDESTRIAN IMPROVEMENTS - 14TH LANE & 15TH PLACE RESURFACING <br />PROJECT NO. IRC -1818A BID NO. 2025008 <br />BIDDER'S Name: <br />LS=Lump Sum GAL --Gallon EA=Each CY=Cubic Yard SY=Square Yard TN=Ton LF=Linear Foot SF=Square Foot <br />NOTE: IF THERE ISA DISCREPANCY BETWEEN THE PLANS (SUMMARY OF PAY ITEMS) AND THE ITEMIZED BID SCHEDULE THE BID SCHEDULE WILL BE UTILRED FOR BIDDING <br />PURPOSES. <br />TOTAL PROJECT BID AMOUNT IN WORDS <br />Three Hundred Eighty -Eight Thousand Eight Hundred Three Dollars and Sixty -Four Cents. <br />00310-3 <br />FAPubk Works%ENGINEERING DIVISION PROJECTS1818A 14th Ln & 15th PI Resurfacing%I-Adminl8i 10d DOGUmentSWtASTER ITEMIZED BID SCHEDULE <br />Description <br />Unit <br />Quantity <br />Unk Price <br />Amount <br />g102-17T'.' <br />OBILIZATION/DEMOBILIZATION <br />LS1 <br />$54,489.41 <br />$ 54,489.41 <br />- <br />AINTENANCE OF TRAFFIC <br />LS <br />1 <br />$24,295.87 <br />$ 24,295.87 <br />104-2 <br />PREVENTION CONTROL & ABATEMENT OF EROSION & WATER POLLUTION <br />LS <br />1 <br />$2,127.56 <br />$ 2,127,56 <br />110-1-1A <br />CLEARING AND GRUBBING (RIGHT-OF-WAY) <br />LS <br />1 <br />$10,342.99 <br />$ 10,342.99 <br />110-1-1B <br />CLEARING, TREE AND STUMP REMOVAL DRAINAGE EASEMENT) <br />LS <br />1 <br />$9,125.07 <br />$9,125.07 <br />110.74 <br />MAILBOX REMOVE AND RESET SINGLE <br />EA <br />10 <br />$230.46 <br />$ 2,304.60 <br />110-23 <br />TREE & STUMP REMOVAL RIGHT-OF-WAY) <br />EA <br />2 <br />$2,660.46 <br />$ 5,320.92 <br />120-1 <br />REGULAR EXCAVATION <br />CY <br />BD <br />$29.17 <br />$ 2,333.60 <br />120-6 <br />EMBANKMENT <br />CY <br />80 <br />$36.89 <br />$ 2,951.20 <br />283-1 <br />ASPHALT EMULSION TYPE CSS -1H <br />GAL <br />2,240 <br />$4.02 <br />$ 9,004.60 <br />283-2 <br />PORTLAND CEMENT TYPE 1 <br />TN <br />12 <br />$298.74 <br />$ 3,584.88 <br />283-7 <br />FULL DEPTH RECLAMATION (SO" MIXING DEPTH) <br />SY <br />1,120 <br />$27.98 <br />$ 31,337.60 <br />285-704 <br />OPTION AL BASE GROUP 4 -(CEMENTED COQUINA, LBR-100,6") <br />SY <br />1,300 <br />$25.15 <br />$32,695.00 <br />286-2 <br />REPLACE ASPHALT DRIVEWAY (1-1/2" SP -9.5 ASPHALT CONCRETE) <br />SY <br />70 <br />$58.08 <br />$ 4,065.60 <br />334-1-S3 <br />SUPERPAVE ASPHALT CONCRETE SP -9.5) RAFFICC PG76-22(1-12") <br />TON <br />100 <br />$281.53 <br />$26,153.00 <br />430-94-1 <br />CLEAR AND DESILT DRAINAGE PIPE, 0-24" <br />LF <br />22 <br />$16.93 <br />$ 416.46 <br />430-94-2 <br />CLEAR AND DESILT DRAINAGE PIPE 25-36" <br />LF <br />6 <br />$27.84 <br />$ 167.04 <br />430.175-115 <br />PIPE CULVERT, ROUND, 15" SCD (POLYPROPYLENE) <br />LF <br />2000 <br />$151.31 <br />$ 3,026.20 <br />520.1 <br />CONCRETE FLUME <br />EA <br />2 <br />$1,536.13 <br />$ 3,072.26 <br />520.3 <br />CONCRETE VALLEY GUTTER 2' WIDE, 3000 PSI MIN.) <br />LF <br />775 <br />$33.77 <br />$26,171.75 <br />522-2 <br />REPLACE CONCRETE DRIVEWAY (6" THICK 3000 PSI MIN. <br />SY <br />135 <br />$91.84 <br />$ 12,398.40 <br />526-1-101 <br />REMOVE AND REPLACE BRICK PAVERS <br />SF <br />98 <br />$11.48 <br />$1,125.04 <br />530-3-4 <br />RIPRAP RUBBLE F&I, CULVERT INSTALLATION <br />TN <br />6 <br />$244.59 <br />$ 1,467.54 <br />S70 -1-1A <br />PERFORMANCETURF SOD BAH-) <br />5Y <br />800 <br />$5.42 <br />$4,336.00 <br />570-1-1B <br />PERFORMANCE TURF (SOD) (ST. AUGUSTINE) <br />SY <br />600 <br />$7'37 <br />$ 4,422.00 <br />706-1-3 <br />RAISED PAVEMENT MARKERS, TYPE B <br />EA <br />12 <br />$11.14 <br />$ 133.68 <br />711-11-221 <br />THERMOPLASTIC STANDARD, YELLOW, SOLID, 6" <br />LF <br />200 <br />$10'56 <br />$ 2,116.00 <br />999-1 <br />AS-BUILTSURVEYING AND RECORDDRAWIN PREPARATION BY REGISTERED <br />SURVEYOR) <br />1 <br />$7,$19.17 <br />$ 7,619,17 <br />SUB -TOTAL= <br />$ 288,803162 <br />999-25A <br />FORCE ACCOUNT = <br />$100,000.00 <br />TOTAL PROJECT BID AMOUNT (INCLUDING FORCE ACCOUNTS) _ <br />$ 388,803.64 <br />LS=Lump Sum GAL --Gallon EA=Each CY=Cubic Yard SY=Square Yard TN=Ton LF=Linear Foot SF=Square Foot <br />NOTE: IF THERE ISA DISCREPANCY BETWEEN THE PLANS (SUMMARY OF PAY ITEMS) AND THE ITEMIZED BID SCHEDULE THE BID SCHEDULE WILL BE UTILRED FOR BIDDING <br />PURPOSES. <br />TOTAL PROJECT BID AMOUNT IN WORDS <br />Three Hundred Eighty -Eight Thousand Eight Hundred Three Dollars and Sixty -Four Cents. <br />00310-3 <br />FAPubk Works%ENGINEERING DIVISION PROJECTS1818A 14th Ln & 15th PI Resurfacing%I-Adminl8i 10d DOGUmentSWtASTER ITEMIZED BID SCHEDULE <br />