ITEMIZED BID SCHEDULE
<br />43RD AVE. BICYCLCE AND PEDESTRIAN IMPROVEMENTS - 14TH LANE & 15TH PLACE RESURFACING
<br />PROJECT NO. IRC -1818A BID NO. 2025008
<br />BIDDER'S Name:
<br />LS=Lump Sum GAL --Gallon EA=Each CY=Cubic Yard SY=Square Yard TN=Ton LF=Linear Foot SF=Square Foot
<br />NOTE: IF THERE ISA DISCREPANCY BETWEEN THE PLANS (SUMMARY OF PAY ITEMS) AND THE ITEMIZED BID SCHEDULE THE BID SCHEDULE WILL BE UTILRED FOR BIDDING
<br />PURPOSES.
<br />TOTAL PROJECT BID AMOUNT IN WORDS
<br />Three Hundred Eighty -Eight Thousand Eight Hundred Three Dollars and Sixty -Four Cents.
<br />00310-3
<br />FAPubk Works%ENGINEERING DIVISION PROJECTS1818A 14th Ln & 15th PI Resurfacing%I-Adminl8i 10d DOGUmentSWtASTER ITEMIZED BID SCHEDULE
<br />Description
<br />Unit
<br />Quantity
<br />Unk Price
<br />Amount
<br />g102-17T'.'
<br />OBILIZATION/DEMOBILIZATION
<br />LS1
<br />$54,489.41
<br />$ 54,489.41
<br />-
<br />AINTENANCE OF TRAFFIC
<br />LS
<br />1
<br />$24,295.87
<br />$ 24,295.87
<br />104-2
<br />PREVENTION CONTROL & ABATEMENT OF EROSION & WATER POLLUTION
<br />LS
<br />1
<br />$2,127.56
<br />$ 2,127,56
<br />110-1-1A
<br />CLEARING AND GRUBBING (RIGHT-OF-WAY)
<br />LS
<br />1
<br />$10,342.99
<br />$ 10,342.99
<br />110-1-1B
<br />CLEARING, TREE AND STUMP REMOVAL DRAINAGE EASEMENT)
<br />LS
<br />1
<br />$9,125.07
<br />$9,125.07
<br />110.74
<br />MAILBOX REMOVE AND RESET SINGLE
<br />EA
<br />10
<br />$230.46
<br />$ 2,304.60
<br />110-23
<br />TREE & STUMP REMOVAL RIGHT-OF-WAY)
<br />EA
<br />2
<br />$2,660.46
<br />$ 5,320.92
<br />120-1
<br />REGULAR EXCAVATION
<br />CY
<br />BD
<br />$29.17
<br />$ 2,333.60
<br />120-6
<br />EMBANKMENT
<br />CY
<br />80
<br />$36.89
<br />$ 2,951.20
<br />283-1
<br />ASPHALT EMULSION TYPE CSS -1H
<br />GAL
<br />2,240
<br />$4.02
<br />$ 9,004.60
<br />283-2
<br />PORTLAND CEMENT TYPE 1
<br />TN
<br />12
<br />$298.74
<br />$ 3,584.88
<br />283-7
<br />FULL DEPTH RECLAMATION (SO" MIXING DEPTH)
<br />SY
<br />1,120
<br />$27.98
<br />$ 31,337.60
<br />285-704
<br />OPTION AL BASE GROUP 4 -(CEMENTED COQUINA, LBR-100,6")
<br />SY
<br />1,300
<br />$25.15
<br />$32,695.00
<br />286-2
<br />REPLACE ASPHALT DRIVEWAY (1-1/2" SP -9.5 ASPHALT CONCRETE)
<br />SY
<br />70
<br />$58.08
<br />$ 4,065.60
<br />334-1-S3
<br />SUPERPAVE ASPHALT CONCRETE SP -9.5) RAFFICC PG76-22(1-12")
<br />TON
<br />100
<br />$281.53
<br />$26,153.00
<br />430-94-1
<br />CLEAR AND DESILT DRAINAGE PIPE, 0-24"
<br />LF
<br />22
<br />$16.93
<br />$ 416.46
<br />430-94-2
<br />CLEAR AND DESILT DRAINAGE PIPE 25-36"
<br />LF
<br />6
<br />$27.84
<br />$ 167.04
<br />430.175-115
<br />PIPE CULVERT, ROUND, 15" SCD (POLYPROPYLENE)
<br />LF
<br />2000
<br />$151.31
<br />$ 3,026.20
<br />520.1
<br />CONCRETE FLUME
<br />EA
<br />2
<br />$1,536.13
<br />$ 3,072.26
<br />520.3
<br />CONCRETE VALLEY GUTTER 2' WIDE, 3000 PSI MIN.)
<br />LF
<br />775
<br />$33.77
<br />$26,171.75
<br />522-2
<br />REPLACE CONCRETE DRIVEWAY (6" THICK 3000 PSI MIN.
<br />SY
<br />135
<br />$91.84
<br />$ 12,398.40
<br />526-1-101
<br />REMOVE AND REPLACE BRICK PAVERS
<br />SF
<br />98
<br />$11.48
<br />$1,125.04
<br />530-3-4
<br />RIPRAP RUBBLE F&I, CULVERT INSTALLATION
<br />TN
<br />6
<br />$244.59
<br />$ 1,467.54
<br />S70 -1-1A
<br />PERFORMANCETURF SOD BAH-)
<br />5Y
<br />800
<br />$5.42
<br />$4,336.00
<br />570-1-1B
<br />PERFORMANCE TURF (SOD) (ST. AUGUSTINE)
<br />SY
<br />600
<br />$7'37
<br />$ 4,422.00
<br />706-1-3
<br />RAISED PAVEMENT MARKERS, TYPE B
<br />EA
<br />12
<br />$11.14
<br />$ 133.68
<br />711-11-221
<br />THERMOPLASTIC STANDARD, YELLOW, SOLID, 6"
<br />LF
<br />200
<br />$10'56
<br />$ 2,116.00
<br />999-1
<br />AS-BUILTSURVEYING AND RECORDDRAWIN PREPARATION BY REGISTERED
<br />SURVEYOR)
<br />1
<br />$7,$19.17
<br />$ 7,619,17
<br />SUB -TOTAL=
<br />$ 288,803162
<br />999-25A
<br />FORCE ACCOUNT =
<br />$100,000.00
<br />TOTAL PROJECT BID AMOUNT (INCLUDING FORCE ACCOUNTS) _
<br />$ 388,803.64
<br />LS=Lump Sum GAL --Gallon EA=Each CY=Cubic Yard SY=Square Yard TN=Ton LF=Linear Foot SF=Square Foot
<br />NOTE: IF THERE ISA DISCREPANCY BETWEEN THE PLANS (SUMMARY OF PAY ITEMS) AND THE ITEMIZED BID SCHEDULE THE BID SCHEDULE WILL BE UTILRED FOR BIDDING
<br />PURPOSES.
<br />TOTAL PROJECT BID AMOUNT IN WORDS
<br />Three Hundred Eighty -Eight Thousand Eight Hundred Three Dollars and Sixty -Four Cents.
<br />00310-3
<br />FAPubk Works%ENGINEERING DIVISION PROJECTS1818A 14th Ln & 15th PI Resurfacing%I-Adminl8i 10d DOGUmentSWtASTER ITEMIZED BID SCHEDULE