My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-273
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-273
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2025 10:27:07 AM
Creation date
1/7/2025 10:23:42 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
10/22/2024
Control Number
2024-273
Agenda Item Number
8.H.
Entity Name
Edlund, Dritenbas, , Brinkley Architects and Associates, P.A.
Subject
Architecture Services Work Order 2 for Fire Station 15 Design
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
=' <br />1M <br />Mr. John Binkley <br />October 7, 2024 <br />Page 7 <br />Proposal: 24-0399 <br />12. Review the record drawings as submitted by the Contractor to MBV and provide <br />revisions as needed to Contractor. <br />13. Preparation and submittal of certification packages to the following jurisdictional <br />agencies: Indian River County, St. Johns River Water Management District and FDEP <br />(Sewer/Water). <br />Erosion Control: Pursuant to the State of Florida NPDES regulations, all construction sites shall <br />be required to conduct weekly NPDES inspections during site -work construction, and monthly <br />inspections during vertical construction, by a certified NPDES Inspector. Inspections will also be <br />required within 24 hours after the site has experienced '/2" or more of rainfall during the <br />construction phase. It is understood the County, or the selected Contractor, will provide the <br />required NPDES Inspections and therefore that scope is not included in this proposal. <br />NOTE: It is assumed the selected contractor will provide the above described erosion control <br />inspection services and is therefore not included in this contract but provided to inform the Owner <br />that these will be needed during construction as required by law. Should the selected contractor <br />not have the required State Certification to conduct these weekly inspections, MBV will be happy <br />to provide a proposal at that time for these services. <br />Task 8 — Landscape Design (LSP -1) <br />Using DWG files provided by others containing a site plan, existing and proposed utilities, and <br />relevant survey information, as well as any existing tree information, we will provide a landscape <br />plan & irrigation plan for the property as required by Indian River County. All plant material will <br />be quantified, coded, and put into a detailed list. Plans will include planting details and <br />specifications. <br />Part I — Landscape Plans <br />1. Provide a code required landscape plan for all green areas within project scope to include <br />required perimeter buffers, vehicular use areas, building foundation, & open space areas. <br />2. Provide a tree disposition/mitigation plan for existing trees within project scope. (Tree <br />survey/report to be provided by others if required) <br />3. Includes (1) modifications to plans due to client comments. <br />4. Provide signed and sealed landscape plans for government submittal. <br />Part H — Responses to County comments Post Submittal <br />1. Coordination with government/client during approval process. <br />2. Provide modifications to plans due to government comments. <br />3. Provide final approved landscape plans for permit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.