My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-273
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-273
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2025 10:27:07 AM
Creation date
1/7/2025 10:23:42 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
10/22/2024
Control Number
2024-273
Agenda Item Number
8.H.
Entity Name
Edlund, Dritenbas, , Brinkley Architects and Associates, P.A.
Subject
Architecture Services Work Order 2 for Fire Station 15 Design
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
=, <br />10 <br />Mr. John Binkley <br />October 7, 2024 <br />Page 4 <br />Proposal: 24-0399 <br />3. Review of the subsurface soils investigation. No cost of geotech work is included in this <br />proposal. MBV will assist in identifying approximate soil boring locations needed for the <br />civil portion of the site development. The geotechnical firm shall contract directly with <br />Owner. <br />4. Attendance at four (4) design development meetings with IRC and project Architect for <br />site plan layout completion. <br />5. Finalization of the Civil site plan layout. <br />6. Development of the stormwater adICPR drainage model and calculations for the <br />development's stormwater containment system sizing and runoff analysis. <br />7. Design of the paving, grading, and drainage system. <br />8. Design of the on-site utilities. We assume that water and sewer service is available adjacent <br />to the site. No cost of off-site utility design or permitting is included in this proposal. <br />9. Coordination with the project Architect. It is understood the Architect will provide all final <br />building layouts, inclusive of MEP utilities, to MBV in CAD formats to be used in the <br />development of the site construction documents. MBV will provide Civil design plan <br />documents in CAD formats as requested by the project Architect throughout the course of <br />the design and permitting phase. <br />10. Project coordination with the landscape architect. MBV shall coordinate with the <br />Landscape Architect during the design process and provide CAD base plans as required <br />for the development of the Landscape Plans and details. Landscape architect shall provide <br />all landscape design plans and responses to comments as needed for project permitting. <br />The cost of landscape design and permitting services has been included in this proposal. <br />See Task 8 for Landscape Design scope. <br />11. Project coordination with the Environmentalist. MBV shall coordinate with the project <br />Environmentalist during the design process and provide CAD base plans as required for <br />the development of any Environmental documents. The Environmental consultant shall <br />provide all reports, plans, applications, and responses to comments as needed for project <br />permitting. The cost of Environmental services has been included in this proposal. See <br />Task 2 for Environmental scope. <br />12. Development of civil construction plans consisting of, or a combination thereof: <br />• Cover Page <br />• General Notes Plan <br />• Existing Conditions Plan <br />• Demolition Plan <br />• Erosion Control Plan and Details <br />• Site Plan <br />• Paving, Grading and Drainage Plan <br />• Utility Plan <br />• Cross Sections Plan <br />• Site Details Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.