My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-273
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-273
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2025 10:27:07 AM
Creation date
1/7/2025 10:23:42 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
10/22/2024
Control Number
2024-273
Agenda Item Number
8.H.
Entity Name
Edlund, Dritenbas, , Brinkley Architects and Associates, P.A.
Subject
Architecture Services Work Order 2 for Fire Station 15 Design
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
■ <br />Mr. John Binkley <br />October 7, 2024 <br />Page 5 <br />Proposal: 24-0399 <br />• Paving, Grading and Drainage Details Plans <br />• Utility Details Plan <br />13. Preparation of the following design reports for the subject project: <br />• Stormwater Management Calculations <br />• Lift Station Calculations <br />14. Preparation of the following permit applications: <br />a. IRC Major Site Plan <br />b. IRC Land Clearing <br />C. IRC Tree Removal <br />d. IRC Concurrency (Conditional and Final) <br />e. IRC Stormwater <br />f. IRC Right -of -Way <br />g. IRC Utilities <br />h. IRC Fire Review <br />i. SRID Connection/Discharge <br />j. SJRWMD Environmental Resource Permit <br />k. FDEP Water Distribution <br />1. FDEP Wastewater Collection <br />In. FDEP NPDES Notice of Intent <br />15. Submission of civil plans and application packages to permit agencies. <br />16. Attendance at the IRC Technical Review Committee meeting. <br />17. Coordination with jurisdictional agency representatives and Owner on agency review <br />comments. <br />18. Final Construction drawing revisions per jurisdictional comments and resubmittal to <br />agencies for final approvals. <br />Task 5 — Cost Estimates (CIV -3) <br />This task includes development of two (2) cost estimates (50% Design Phase and 100% design <br />phase) for the Civil portion of the project. <br />Task 6 — Bidding Services (CIV -4) <br />The COUNTY shall be responsible for setting the providing the front-end bid documents, bid <br />opening date, advertisement of the bid, scheduling the pre-bid meeting, and scheduling the bid <br />opening. MBV will provide the following in support of the bidding phase: <br />1. Preparation of Civil Documents for Bidding (Electronic (PDF) and Hard Copy formats). <br />2. Transmittal of Final Cost Estimate for 100% Plans. <br />3. Attendance at (1) Pre -Bid Meeting. <br />
The URL can be used to link to this page
Your browser does not support the video tag.