Laserfiche WebLink
A TRUE COPY <br />CERTIFICATION ON LAST PAGE <br />RYAN L. BUTLER, CLERK <br />AGREEMENT FOR SIGNAL COHABITATION AND SYNCHRONIZATION OF <br />GRADE CROSSING AND TRAFFIC CONTROL DEVICES <br />THIS AGREEMENT, made and entered this day of , 20_, by and between <br />FLORIDA EAST COAST RAILWAY L.L.C., a Limited Liability Company organized and existing under the laws of <br />FLORIDA , with its principal place of business in the city of JACKSONVILLE, County of DUVAL, State of FLORIDA, <br />(hereinafter "FEC") and BRIGHTLINE TRAINS FLORIDA LLC„ a Limited Liability Company organized and existing <br />under the laws of DELAWARE, with its principal place of business in the city of MIAMI, County of MIAMI -DARE, State <br />of FLORIDA (hereinafter `BL"); and INDIAN RIVER COUNTY, a political subdivision of the State of Florida (hereinafter <br />"COUNTY"). <br />WHEREAS, train -activated railroad grade crossing warning devices, (hereinafter "Crossing Warning Devices"), <br />presently exist at the railroad/highway grade crossing on 45th Street which crosses at grade the right of way and tracks of <br />FEC's Mile Post 224 + 4945 feet in or near Indian River County. Florida (hereinafter the "Crossing"); and <br />WHEREAS, a highway -to -highway intersection exists adjacent to or in close proximity to the aforementioned <br />Crossing; and the COUNTY in the interest of safety, desires that the Crossing Warning Devices be synchronized with existing <br />and/or proposed highway traffic signal devices, including but not limited to traffic signal heads, vehicle detection systems <br />and signage (hereinafter "Highway Signal Devices"), so as to assist in clearing highway traffic from the Crossings upon the <br />approach of trains, and to provide for improved operational efficiency of the highway system during train passage; and <br />WHEREAS, the Florida Department of Transportation, through the process of a Grade Crossing Diagnostic <br />following the procedures set forth in the Florida Department of Transportation State Rail Handbook, recommends the <br />mounting of Highway Signal Devices onto a railroad truss structure to limit visual conflicts for motorists and enhance public <br />safety; and <br />WHEREAS, the work to be contemplated hereunder is subject to the provisions of the Federal Highway <br />Administration Federal Aid Policy Guide, 23 C.F.R. Subchapter B, Part 140, Subpart I, as amended, and Federal Aid Policy <br />Guide, 23 C.F.R. Subchapter G, Part 646, Subpart B, as amended and the Florida Department of Transportation's Rule 14- <br />57.011 Florida Administrative Code as amended; <br />NOW, THEREFORE, in consideration of the mutual undertaking as herein set forth, the parties agree as follows: <br />1. BL will construct, at BL's expense, overhead trusses and cantilevers, and the Highway Signal Devices, on behalf of <br />the COUNTY, on the overhead trusses and cantilevers, as shown on the plans attached hereto as Exhibit A. <br />2. The COUNTY, upon final acceptance of the installation, will operate and maintain the Highway Signal Devices at its <br />expense. The COUNTY agrees to give FEC sufficient notice prior to making any changes in the operation thereof <br />which, in any way, might affect the coordination features of the Crossing Warning Devices. In the event said Highway <br />Signal Devices, and/or coordinating facilities of the COUNTY become inoperative, the COUNTY will notify FEC <br />and restore or repair such devices and/or facilities promptly, and use other means, including traffic control personnel <br />or law enforcement personnel, to control the flow of traffic at the traffic signal locations at any time the Highway <br />Signal Devices or preemption devices are inoperative so as to clear the highway/railroad grade Crossing before the <br />approach of trains. <br />3. FEC will operate and maintain the Crossing Warning Devices, overhead trusses and cantilevers pursuant to the <br />Crossing License Agreement ("License Agreement") identified in Exhibit B, and likewise agrees to give the <br />COUNTY sufficient advance notice prior to making any changes in the operation thereof which, in any way, would <br />affect the coordination features of the COUNTY'S Highway Signal Devices. In the event said Crossing Warning <br />Devices and/or coordination facilities of FEC become inoperative, FEC will notify COUNTY and restore or repair <br />such devices and/or facilities. <br />4. BL, at its expense, and on behalf of the COUNTY, will furnish and install a preemption synchronization circuit of the <br />"closed loop fail safe design principle," (in which the normally closed electrical contacts will open on approach or <br />presence of a train), to a common cable junction box and install other equipment necessary to provide adequate <br />preemption time. The installation of the junction box will be done near or adjacent to the COUNTY'S Highway Signal <br />Devices control cabinet. <br />