Laserfiche WebLink
a PROCTOR <br />C O N S T R U C T I O N <br />Indian River County Fire Department <br />Fire Station #11 <br />Assumptions & Clarifications <br />10/17/2024 Revised 11/13/24 <br />General <br />1 We include a payment or performance bond. <br />2 We do NOT include impact fees. <br />3 We do NOT include governmental fees of any kind. <br />4 We do NOT include building permit fees. <br />5 We do NOT include Builder's Risk Insurance. Proctor Construction will obtain Builder's Risk Insurance <br />proposals on the Owner's behalf, if requested by owner. The Owner shall be named the primary <br />insured party with Proctor Construction also listed as a named insured. <br />6 All Builder's Risk Insurance deductibles are payable by the Owner. <br />7 The Builder's Risk Insurance is to be in effect from the Date Of Commencement until final Certificate <br />of Occupancy. <br />8 We do NOT include hazardous materials inspection, testing, removals or abatement. <br />9 We do NOT include the services of a Threshold Inspector. <br />10 We do NOT include the services of a Private Provider for permit document review. <br />11 We do NOT include the services of an independent testing agency for testing concrete, soil <br />compaction, grouting, steel construction, etc. <br />12 At least on a quarterly basis during the project duration, the Owner shall provide updated and clouded <br />design drawings of full size incorporating all sketches and all design clarifications. <br />13 Projects that are participating in Owners Direct Purchasing procedures should note that profit has <br />been included and will be paid to PCC for owner paid material invoices. <br />14 Any costs resulting from unforeseen conditions, drawing errors and omissions, and for buyout of trade <br />subcontractors are not to be funded through the use of the construction contingency. Construction <br />Contingency is solely for the use of scope gaps and misses by the Contractor. Any unused <br />contingency will be returned to owner. <br />15 Buyout savings shall be utilized at the Contractors discretion for the procurement of subcontractors, <br />materials, and any other items required for the execution of this scope of work. <br />