Laserfiche WebLink
IRC -9999 <br />SECTION 00800 - SUPPLEMENTARY CONDITIONS TO THE <br />GENERAL CONDITIONS <br />SC -1.00 Introduction <br />These Supplementary Conditions amend or supplement the Standard General Conditions of the <br />Construction Contract (No. 1910-8, 1996 Edition) and other provisions of the Contract Documents as <br />indicated below. All provisions, which are not so amended or supplemented, remain in full force and <br />effect. <br />The terms used in these Supplementary Conditions will have the meanings indicated in the General <br />Conditions. <br />SC -1.01 Defined Terms <br />SC -1.01.A.20 Add the following language to the end of GC 1.01.A.20. <br />ENGINEERS's Consultant: Edlund, Ddritenbas, Binkely Architects & Associates, P.A. <br />65 Royal Palm Pointe, Suite D <br />Vero Beach, FL 32960 <br />SC -1.01.A.21. Delete paragraph GC 1.01.A.21 in its entirety. <br />SC -1.02 Terminology <br />SC -1.02.D.1, 2, and 3 Delete paragraphs GC -1.02.D.1, 2, and 3 in their entirety and insert the following <br />paragraphs in their place: <br />D. Furnish, Install, Perform, Provide <br />1. The word "furnish" shall mean to supply and deliver services, materials, or equipment to <br />the Site (or some other specified location) ready for use or installation and in usable or <br />operable condition. <br />2. The word "install" shall mean to put into use or place in final position services, materials, or <br />equipment complete and ready for intended use. <br />3. The words "perform" or "provide" shall mean to furnish and install services, materials, or <br />equipment complete and ready for intended use. <br />SC -2.05 Before Starting Construction <br />SC -2.05.C. Delete paragraph GC2.05.Cin its entirety and insert the following paragraph in its place: <br />C. Evidence of Insurance: CONTRACTOR shall not commence work under this Contract <br />until he has obtained all insurance required under Article 5 and such insurance has <br />been delivered to the OWNER and approved by the OWNER, nor shall the <br />CONTRACTOR allow any Subcontractor to commence work on his subcontract until <br />all similar insurance required of the Subcontractor has been so obtained and <br />approved. All such insurance shall remain in effect until final payment and at all <br />times thereafter when CONTRACTOR may be correcting, removing or replacing <br />defective Work in accordance with Article 13. <br />SC -2.06 Preconstruction Conference <br />SC -2.06 Delete paragraph GC -2.06.A in its entirety and insert the following paragraph in its place: <br />A. Immediately after awarding the contract, but before the CONTRACTOR begins work, <br />Supplementary Conditions - 00800-2 <br />