My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-311
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-311
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2025 2:38:17 PM
Creation date
1/13/2025 1:59:34 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
12/03/2024
Control Number
2024-311
Agenda Item Number
14.A.
Entity Name
The Ohio Casualty Insurance Company
Subject
Tripartite Tender Agreement for Fire Station 11 Completion Contract 1/10/25
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC -9999 <br />the Project Manager will call a preconstruction conference at a place the ENGINEER <br />designates to establish an understanding among the parties as to the work and to <br />discuss schedules referred to in paragraph 2.05.13, procedures for handling Shop <br />Drawings and other submittals, and maintaining required records. Utility companies <br />and others as appropriate will be requested to attend to discuss and coordinate work. <br />>< <br />Per the FDOT Standard Specifications for Road and Bridge Construction, the <br />Contractor will certify to the Engineer the following: <br />1. A listing of on-site clerical staff, supervisory personnel and their pro -rated time <br />assigned to the contract, <br />2. Actual Rate for items listed in Table 4-3.2.1 (see below), <br />3. Existence of employee benefit plan for Holiday, Sick and Vacation benefits and a <br />Retirement Plan, and, <br />4. Payment of Per Diem is a company practice for instances when compensation for Per <br />Diem is requested. <br />SC -3.06 <br />Such certification must be made by an officer or director of the Contractor with authority <br />to bind the Contractor. Timely certification is a condition precedent to any right of the <br />Contractor to recover compensations for such costs, and failure to timely submit the <br />certification will constitute a full, complete, absolute and irrevocable waiver by the <br />Contractor of any right to recover such costs. Any subsequent changes shall be certified <br />to the Engineer as part of the cost proposal or seven calendar days in advance of <br />performing such extra work. <br />FDOT Table <br />4-3.2.1 <br />Item <br />Rate <br />FICA <br />Rate established by Law <br />FUTA/SUTA <br />Rate established by Law <br />Medical Insurance <br />Actual <br />Holidays, Sick & Vacation Benefits <br />Actual <br />Retirement Benefits <br />Actual <br />Workers Compensation <br />Rates based on the National Council on <br />Compensation Insurance basic rates tables <br />adjusted by Contractor's actual experience <br />modification factor in effect at the time of the <br />additional work or unforeseen work <br />Per Diem <br />Actual but not to exceed State of Florida's rate <br />*Compensation for Insurance is limited solely to General Liability Coverage and does not include any other <br />insurance coverage (such as, but not limited to, Umbrella Coverage, Automobile Insurance, etc.). <br />ans, <br />S <br />SC -3.06 Add the following new paragraphs immediately after paragraph GC -3.05: <br />A. In case q�f discre arc, th�e.overni a.der, of the documents shall be as follows: <br />ontractc�rs s um ti ns andari ications <br />1. ritten Interpretations <br />2. Addenda <br />3. Specifications <br />4. Supplementary Conditions to the General Conditions <br />5. General Conditions <br />6. Approved Shop Drawings <br />Supplementary Conditions - 00800-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.