My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-026
CBCC
>
Official Documents
>
2000's
>
2001
>
2001-026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 10:40:12 AM
Creation date
2/20/2025 10:34:14 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/30/2001
Control Number
2001-026
Entity Name
Ranger Construction
Subject
Contract for Dune Restoration Project
Project Number
IRC-3041
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
256
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
to <br />C] <br />L. Intemretations of Plans and Contract Documents <br />The CONTRACTOR shall verify all dimensions, quantities, locations, materials and details <br />shown on the Plans, Supplementary Drawings, schedules or other data received from the <br />Architect or Engineer, and shall notify him of all errors, omissions, conflicts and <br />discrepancies found therein. Failure to discover or convect errors, conflicts or discrepancies <br />shall not relieve the CONTRACTOR of full responsibility for unsatisfactory work, faulty <br />construction, or improper operation resulting therefrom nor from rectifying such condition <br />at his own expense. He will not be allowed to take advantage of any error or omissions, as <br />full instructions will be furnished by the Architect or Engineer, should any error or omissions <br />be discovered. All schedules are given for the convenience of the Engineer and <br />CONTRACTOR and are not guaranteed to be complete. <br />M. Changes Extra And Omitted Work <br />It is mutually agreed that no change involving change in cost, either to the OWNER <br />or CONTRACTOR, shall be made except upon written permission of the OWNER. <br />Extra work shall be paid for as set forth in this Paragraph. Omitted work shall be <br />credited against the money due the CONTRACTOR by one of the methods described <br />in this Article. The CONTRACTOR shall make no claim for extra work unless it has <br />been approved by the OWNER in writing and in advance of the work, except that the <br />CONTRACTOR may proceed to meet an emergency condition if the OWNER'S <br />representative is not available. Work required by surface or subsurface conditions, or <br />both, other than were foreseen by Bidder at the time of bidding but could have been <br />discovered by test borings or other testing methods, shall not be considered extra <br />work. <br />2. The Engineer shall, in all cases of dispute, determine the amount or quantity of the <br />several kinds of work which are to be paid for under this Contract, and shall decide <br />all questions relative to the execution of the same, and such estimates and decisions <br />shall be final and binding. <br />3. Any work not herein specified, which may be fairly implied as included in the <br />Contract, of which the Engineer shall adjudge, shall be done by the CONTRACTOR <br />without extra charge. <br />4. The Contract price may only be changed by a Change Order as authorized by the <br />County Commission. This includes extra work. Authorization of extension of time <br />shall not constitute a waiver of liquidated damages. Work required by surface or <br />subsurface conditions, or both, other than were foreseen by CONTRACTOR prior to <br />signing the Contract but could have been discovered by test borings or other testing <br />methods, shall not be considered extra work. <br />5. The OWNER may, at any time by a written order and without notice to the sureties, <br />require the performance of such extra work as it may find necessary or desirable <br />arising out of the modification of the Contract Drawings. All work so ordered must <br />be performed by the CONTRACTOR. The amount of compensation to be paid to the <br />CONTRACTOR for any work so ordered shall be determined as follows: <br />SUPPLEMENTARY CONDITIONS <br />Sc E <br />
The URL can be used to link to this page
Your browser does not support the video tag.