Laserfiche WebLink
H. Familiari)X with Laws <br />R The CONTRACTOR is assumed to be familiar with and shall comply with all Federal, State <br />4 and Local laws, ordinances, rules, codes, and regulations that may affect the work. Ignorance <br />on the part of the CONTRACTOR will in no way relieve him from the responsibility of <br />ft compliance therewith. All work and materials shall comply with those laws. <br />4 I. Commencement and Completion Of Work <br />The CONTRACTOR will be required to commence work under this Contract within ten (10) <br />t calendar days after the date of receipt by him of the Notice to Proceed, and to complete the <br />work by April 1, 2001. The time stated for completion shall include final clean-up of all <br />access locations and premises. <br />t : J. Overtime Work <br />1. Work shall be performed during regular working hours. Regular working hours are <br />defined as Monday through Friday, excluding County Holidays, from 7 AM to 5 PM. <br />2. County Holidays are: New Year's Day, Good Friday, Memorial Day, Independence <br />Day, Labor Day, Veterans Day, Thanksgiving Day, Friday after Thanksgiving, <br />Christmas Eve and Christmas Day. Working on these days will not be permitted <br />' without prior written permission and approval from the Engineer. <br />3. The CONTRACTOR shall receive no additional compensation for overtime work, i.e., <br />work in excess of eight hours in any one calendar day or 40 hours in any one calendar <br />week, even though such overtime work may be required under emergency conditions <br />and may be ordered by the Engineer in writing. <br />L: <br />4. All costs of inspection and testing performed during overtime work by the <br />CONTRACTOR, which is allowed solely for the convenience of the CONTRACTOR, <br />l.: shall be borne by the CONTRACTOR, and a credit given to the County to deduct the <br />costs of all such inspection and testing from any partial payments otherwise due the <br />! CONTRACTOR. <br />L_ <br />5. No work shall commence before 7 AM or continue after 7 PM except in case of <br />emergency upon specific permission of the Engineer. <br />6. In order to meet the specified completion date of April 1, 2001 (start of turtle nesting <br />i season), the contractor may requests permission from the Engineer to work during <br />L times prohibited above. <br />K. Liquidated Damages <br />The amount of liquidated damages for the Project is hereby established as one hundred dollars <br />4: ($100.00) per calendar day. Liquidated damages apply to all portions of the Project. <br />Liquidated damages may be deducted from monies due the CONTRACTOR and shall not <br />j exceed the total contract price. <br />SUPPLEMENTARY CONDITIONS <br />7 SC <br />