Laserfiche WebLink
40 <br />tp <br />6.24 Not less than two percent (2%) of the contract price shall be retained until correct record <br />drawings, specifications, addendas, modifications and shop drawings are delivered to and <br />reviewed by the ENGINEER. <br />Safety and Protection: <br />t <br />s 6.25 CONTRACTOR shall be responsible for initiating, maintaining and supervising all safety <br />( precautions and programs in connection with the Work. CONTRACTOR shall take all <br />necessary precautions for the safety of, and shall provide the necessary protection to prevent <br />damage, injury or loss to: <br />6.25.1 All employees on the Work and other persons and organizations who may be <br />affected thereby; <br />i 6.25.1 All the Work and materials and equipment to be incorporated therein, whether <br />in storage on or off the site; and <br />6.25.3 Other property at the site or adjacent thereto, including trees, shrubs, lawns, <br />-walks, pavements, roadways, structures, utilities and Underground Facilities <br />r not designated for removal, relocation or replacement in the course of <br />construction. <br />' CONTRACTOR shall comply with all applicable Laws and Regulations of any public body <br />having jurisdiction for the safety of persons or property or to protect them from damage, <br />injury or loss; and shall erect and maintain all necessary safeguards for such safety and <br />protection. CONTRACTOR shall notify owners of adjacent property and of Underground <br />Facilities and utility owners when prosecution of the Work may affect them, and shall <br />cooperate with them in the protection, removal, relocation and replacement of their property. <br />All damage, injury or loss to any property referred to in paragraph 6.25.2 or 6.25.3 caused, <br />directly or indirectly, in whole or in part, by CONTRACTOR, and Subcontractor, Supplier <br />or any other person or organization directly or indirectly employed by any of them to perform <br />or furnish any of the Work or anyone for whose acts any of them may be liable, shall be <br />remedied by CONTRACTOR (except damage or loss attributable to the fault of Drawings or <br />Specifications or to the acts or omissions of OWNER or ENGINEER or anyone employed by <br />either of them or anyone for whose acts either of them may be liable, and not attributable, <br />directly or indirectly, in whole or in part, to the fault or negligence of CONTRACTOR). <br />i - CONTRACTOR's duties and responsibilities for the safety and protection of the Work shall <br />continue until such time as all the Work is completed and ENGINEER has issued a notice to <br />OWNER and CONTRACTOR in accordance with paragraph 14.13 that the Work is <br />`- acceptable (except as otherwise expressly provided in connection with Substantial <br />Completion). <br />`W 6.26 CONTRACTOR shall designate a responsible representative at the site whose duty shall be <br />the prevention of accidents. This person shall be CONTRACTOR's superintendent unless <br />otherwise designated in writing by CONTRACTOR to OWNER. <br />GENERAL COtdtai i IONS <br />GC17 <br />