Laserfiche WebLink
CA <br />40 <br />Scope of Work <br />Page 11 <br />that ATM will be responding to concerns over engineering and beach fill performance - <br />related issues following placement. These concerns will likely be lodged by numerous <br />(greater than 5) third party interests, although the EA document should provide the <br />information necessary for reference to respond to these third party letters of concern <br />and comment (e.g., Audubon, Caribbean Conservation Corporation, Environmental <br />Defense Fund, ReefKeeper International). The County and the County's EC will <br />respond to concerns related to environmental issues (e.g., nearshore hardbottom, <br />marine turtle and manatee protection), whereas ATM will not be addressing nor asked <br />to respond to environmental concerns. <br />Task 1.B.6 Review USAGE Statement of Findings for Sectors 1 and 2 <br />Upon receipt of the USACE Permit Instrument, ATM shall carefully review and comment <br />on any discrepancies or permit language that could be of potential concern to the <br />County in pursuit of the Project construction and subsequent performance monitoring. <br />A list of such concerns and the affected conditions will be prepared for review with the <br />County staff, after which a formal response to the USACE requesting corrective action <br />will be prepared. <br />TASK 2 ENVIRONMENTAL DOCUMENT SCOPING, PREPARATION <br />AND PROCESSING FOR SECTORS 1 AND 2 <br />Task 2.1 Scoping Meeting with Federal and State Regulatory Agencies <br />ATM shall assist the County with scheduling, preparation, and conduct of one meeting <br />of the appropriate DEP, USACE, and other state and federal agency representatives as <br />deemed necessary to discuss the Sectors 1 and 2, and develop a preliminary outline of <br />the environmental document components (draft table of contents). It is anticipated that <br />this meeting will be conducted in Jacksonville and will require one business day to <br />complete. The direction being taken following consultation with the USACE <br />Jacksonville District on 8 November (and as represented in the Task 2 scope items <br />below) is that the Sectors 1 and 2 shoreline restoration project can proceed with the <br />preparation of an Environmental Assessment (EA) document. <br />Due to the diversity of the existing nearshore hardbottorn resources in the project <br />areas, Sectors 3 and 5 will likely require the preparation of Environmental Impact <br />Statement (EIS) documents. Preparation of such documents will be undertaken under <br />separate authorization. <br />Task 2.2 Sectors 1 and 2 Environmental Assessment Documentation <br />The document sections to be prepared by the Project Team include: Project Purpose <br />and Need for Action, Affected Environment, Alternatives, Environmental Consequences <br />C\WNDOW517EMMRC Satan 12 7ACdd—WS-01-18M doJWMI <br />