My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-031
CBCC
>
Official Documents
>
2000's
>
2001
>
2001-031
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 10:58:58 AM
Creation date
2/20/2025 10:58:31 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
02/13/2001
Control Number
2001-031
Subject
Amendment 2 for Professional Service Agreement for
Applied Technology & Management for Design & Permitting
Scope of Servoces and Compensation for IRC Beach Preservation Projects
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
n <br />s <br />scope of Work. <br />Page 10 <br />ATM shall review the 1 st RAI items with County staff within 1 week of receipt, discuss <br />items with USAGE Jacksonville District technical staff as necessary, establish item <br />priority, and prepare the necessary written and/or graphical information to adequately <br />respond to the RAI. Assuming no additional field data acquisition is required and no <br />numerical or analytical model simulations are necessary to prepare the response, ATM <br />shall respond to the first Request for Additional Information within 30 days of receipt. <br />This timeframe shall include preparation of a draft response and review/modification of <br />it with County staff prior to submittal to the Department. <br />Additional field data and/or numerical model simulations are not considered as a <br />component of the scope of work associated with this or other tasks at present. Such <br />services will be dependent upon agency requirements and will require ATM to prepare <br />a separate scope of work and fee proposal for County approval prior to initiating work. <br />Task 1.B.3 Review and Respond to Sectors 1 and 2 Second Agency Request for <br />Additional Information (RAI) <br />ATM shall review the second RAI items with County staff within 14 calendar days of <br />receipt, discuss items with USAGE Jacksonville District technical staff as necessary, <br />establish item priority, and prepare the necessary written and/or graphical information <br />to adequately respond to the RAI. Assuming no additional field data acquisition is <br />required and no numerical or analytical model simulations are necessary to prepare the <br />response, ATM shall respond to the second Request for Additional Information within <br />30 days of receipt. This timeframe shall include preparation of a draft response and <br />review/modification of it with County staff prior to submittal to the District. <br />Task 1.13.4 Review and Respond to Sectors 1 and 2 Third Agency Request for <br />Additional Information (RAI) <br />ATM shall review the third RAI items with County staff within 7 calendar days of receipt, <br />and will thereafter discuss items with USAGE Jacksonville District technical staff as <br />necessary, establish item priority, and prepare the necessary written and/or graphical <br />information to adequately respond to the RAI. Again assuming no additional field data <br />acquisition is required and no numerical or analytical model simulations are necessary <br />to prepare the response, ATM shall respond to the third Request for Additional <br />Information within 30 days of receipt. This timeframe shall include preparation of a <br />draft response and review/modification of it with County staff prior to submittal to the <br />District. <br />Task 1.13.5 Review and Response to Sectors 1 and 2 Engineering -Related <br />Public Notice Items <br />Following agency (USACE) Public Noticing of the Department of the Army Permit, <br />agency, special interest groups and individual responses will be reviewed with the <br />County prior to discussion with USACE staff. ATM and the County shall determine an <br />appropriate response to each item and ATM shall prepare a formal response to agency <br />requests. At this time and in advance of formal application submittal, it is anticipated <br />C IWNOOWSITEMPIRC Sedan 1 2 7 Addieanal S- 01-1600 dcdir22Mi <br />
The URL can be used to link to this page
Your browser does not support the video tag.