Laserfiche WebLink
I> <br />40 <br />® Scope of Work <br />Page 2 <br />TASK 1 MODIFICATION PROCESSING AND ACQUISITION OF PROJECT <br />JOINT COASTAL CONSTRUCTION PERMITS FOR SECTORS 1 & 2 <br />ATM will assemble and maintain, in chronological order, all letters and reports <br />applicable to the Project(s) Permit Correspondence for the County. ATM shall <br />establish telephone and written communication with the State of Florida, Department of <br />Environmental Protection (DEP), USACE Jacksonville District and County sufficient to <br />coordinate agency review of the Permit Application. Our understanding in meeting with <br />the DEP and the County in late August 2000 is that the permit file for Indian River <br />County will be modified to allow each of the Project Sectors to be reviewed and <br />approved individually by assignment of distinct tracking numbers. <br />Task 1A Processing and Acquisition of Sectors 1 & 2 Joint Coastal <br />Permit - DEP <br />Task 1.A.1 Permit Processing ā€” Continued Coordination with County and DEP <br />ATM will conduct and coordinate a meeting with County and DEP staff in Tallahassee <br />to review the existing Joint Coastal Permit application and how to best treat separation <br />of the four proposed project sector initiatives into individual files for agency review, <br />comment, and approval. Specific attention will be focused on Sectors 1 & 2 for the <br />purposes of schedule adherence and desired Winter 2001 construction timeframes. <br />For task costing purposes, an estimate of the permitting budget has been developed <br />for Tasks 1.A.1 through 1.A.4. Cost estimates for these tasks are based on an <br />expected labor hour level of effort, as it is not possible at this juncture to ascertain how <br />many questions will be asked, or the in-depth nature of the information requests <br />contained in the RAI's. The level of comment by federal and state agencies may be <br />excessive due to unforeseen issues and changes in the rules and policies of these <br />agencies and the resulting need for additional information. This budget represents a <br />significant level of labor effort cost estimate based on past experience in permitting <br />large scale dredge and fill projects for beach nourishment projects. If cost savings <br />beyond the expected budget are realized, the excess budget for this task will not be <br />expended on other tasks unless approved by the County in writing. <br />Task 1.A.2 Preparation and Submittal of Revised FDEP Joint Coastal Permit <br />Application for Sectors 1 and 2 <br />ATM shall prepare and submit to the County (in draft form) the appropriate <br />documentation required in association with the individual "Joint Application for Joint <br />Coastal Permit/Authorization to Use Sovereign Submerged Lands/Federal Dredge and <br />Fill Permit" for County review and approval prior to formal submittal to the Department. <br />ATM shall utilize all existing data and information previously developed for each Sector <br />in the initial permit application's preparation and processing. Upon receipt of County <br />approval, ATM shall submit five hard copies and one electronic copy of the individual <br />applications to the DEP. The County shall be furnished with a CD containing the <br />submitted application files for County internal use. <br />C 1WIND0M%TEMP11iC Sedan 12 7 AGQd-1 Sā€” 01-18-001 0O 1r_'701 <br />