My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-054
CBCC
>
Official Documents
>
2000's
>
2001
>
2001-054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2025 2:39:14 PM
Creation date
2/24/2025 2:38:09 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/06/2001
Control Number
2001-054
Agenda Item Number
11.C.
Entity Name
Seimens BUilding Technologies
Subject
Agreement for IRC Jail Detension Electronic Phase I
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />C-1 <br />40 <br />6.4 EXAMINATION OF THE SITE <br />6.1 Before execution of the agreement, the contractor shall visit the job site in order to <br />ascertain the prevailing local conditions which may affect the work to be done. <br />6.2 Arrangements to visit the work site may be made by contacting Lynn Williams, <br />Building & Grounds Superintendent at (561) 567-8000 extension 1419 . <br />6.3 No payment for additional work or materials shall be trade upon any claim of <br />changed conditions(s) if such condition(s) could have been reasonably foreseen upon <br />diligent examination of the site prior to submission of the bid. <br />rRIJK 11101 9A till 101 Y C•lel <br />7.1 The OWNER and its authorized representatives shall be permitted free access and <br />every reasonable facility for the inspection of all work and materials. <br />7.2 Work by OWNER: The OWNER hereby reserves the right to perform activities <br />not covered in this contract in the area where work is being done under this contract with <br />its own forces. <br />7.3 Work by Other CONTRACTORS: The OWNER hereby reserves the right to <br />permit other CONTRACTORS to work within the area which is the site of the work <br />under the contract. <br />7.4 Coordination: CONTRACTOR shall afford OWNER and other CONTRACTORS <br />reasonable opportunity for the introduction and storage of their equipment, materials and <br />the execution of their work concurrently, and shall properly coordinate its work with <br />theirs in the best interest of the County. <br />&0 FONDS <br />8.1 BidSecurfty: Not Required for the project. <br />8.2 Performance Bond: The CONTRACTOR shall furnish a Performance & Payment <br />Bond in the form attached to these specifications in an amount of 125% of the lump sum <br />amount 'bid as security for the full and complete performance of the contract and for the <br />payment of all persons performing labor, furnishing materials or furnishing equipment in. <br />connection with the contract. <br />8.3 Requirements as to .Surety: The surety or Sureties shall be a company or <br />companies satisfactory to the County. Any surety shall be required to have a resident <br />agent in the State of Florida and shall be duly licensed to conduct business therein. The <br />requirement of Florida resident agent may be waived by the OWNER if evidence <br />satisfactory to the OWNER is provided that applicable requirements have been met to <br />permit service of process on a State official under State law. <br />
The URL can be used to link to this page
Your browser does not support the video tag.