My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-054
CBCC
>
Official Documents
>
2000's
>
2001
>
2001-054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2025 2:39:14 PM
Creation date
2/24/2025 2:38:09 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/06/2001
Control Number
2001-054
Agenda Item Number
11.C.
Entity Name
Seimens BUilding Technologies
Subject
Agreement for IRC Jail Detension Electronic Phase I
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />FA <br />C7 <br />SECTION B <br />SPECIAL CONDITIONS <br />1.1 These Special Provisions shall supplement the General Conditions and shall <br />govern purchases by the County of Indian River. <br />2.0 DESCRIPTION OF THE WORK/ALTERATIONS <br />2.1 The work for this project shall consist of furnishing and installing all the necessary <br />equipment, materials and labor for the installation as described in the Scope of Work <br />2.2 Extra work: Without invalidating the contract, the OWNER may at any time, by <br />written change order and without preliminary notice to the surety, order extra work <br />within the general scope or alter the work by addition or reduction, and the contract price <br />will be adjusted accordingly. <br />2.3 Changes in work: The OWNER shall have the right to suspend work wholly or in <br />part for such period or periods as may be deemed necessary due to unsuitable weather or <br />other conditions which the OWNER considers unfavorable for tite work to proceed. No <br />allowance of any kind will be made for such suspension of work except an equivalent <br />time for completion of the contract. <br />2.4 Changed conditions: If during the progress of work, field conditions are found to <br />differ materially from those covered by the Scope of Work or from those which could <br />reasonably have been foreseen by the CONTRACTOR after examination of the site, the <br />CONTRACTOR shall call such conditions to the attention of the OWNER .and necessary <br />changes will be made to the Specifications. If these changes entail extra work or <br />materials the value of such work shall be determined by unit price set out in the contract, <br />or if not set out, the values of such work or change shall be determined by negotiation. <br />The OWNER and CONTRACTOR shall execute a change order to the contract at <br />mutually satisfactory unit prices or Bump sums for any extra work, addition or deletion <br />made necessary by such changed conditions and requested by the County. <br />3.0 COMMENCEMENT OF WORK <br />3.1 The work shall commence immediately upon receipt of a Notice to Proceed, <br />4.0 TIME OF COMPLETION <br />41 The work shall be completed within the time stated in the agreement as time <br />required to complete all work. <br />5.0 CONTRACT PRICE <br />5.1 The OWNER shall pay the CONTRACTOR for the work at the price(s) stated in <br />the agreement. No additional payment shall be made to the CONTRACTOR except for <br />additional work or materials as stated on a valid change order issued by the OWNER <br />prior to the performance of the work or delivery of materials. <br />5.7 Final Payment AccePrance: The acceptance by the CONTRACTOR of final <br />payment due on termination of this contract shall constitute a full and complete release of <br />the OWNER from any and all claims, demands and causes of action whatsoever which <br />the CONTRACTOR, its successors or assigns have or may have against the OWNER <br />under the provisions of this contract. <br />
The URL can be used to link to this page
Your browser does not support the video tag.