My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-054
CBCC
>
Official Documents
>
2000's
>
2001
>
2001-054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2025 2:39:14 PM
Creation date
2/24/2025 2:38:09 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/06/2001
Control Number
2001-054
Agenda Item Number
11.C.
Entity Name
Seimens BUilding Technologies
Subject
Agreement for IRC Jail Detension Electronic Phase I
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />i <br />C-1 <br />Access and Lighting Control System Retrofit <br />System Retrofit for: <br />• Control Room A: Single door locking, lighting, and intercom control <br />console. <br />• Control Room A: Camera system with multiplex monitor control. <br />• Control Room B: Four door lacking, lighting, and intercom control <br />consoles. <br />• Control Room B: Four cameras and monitors. <br />Labor & Documentation: <br />• As built drawings <br />• Complete set of reference manuals and documentation for MTI system <br />• Wiring termination & check out <br />• Device to device check out <br />• Engineering j Installation <br />• Programming / Start Up <br />• One Year Warranty <br />• Owner Training <br />NOT ZNCLUDED: <br />• Repair of any door locks, lighting, and intercom equipment that is <br />determined to be non-functional at the time of installation of new <br />control consoles. <br />
The URL can be used to link to this page
Your browser does not support the video tag.