My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/17/2024
CBCC
>
Meetings
>
2020's
>
2024
>
12/17/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2025 10:26:11 AM
Creation date
3/6/2025 9:19:21 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/17/2024
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M Asset Repair <br />30. <br />Asset <br />Repair <br />31. <br />Asset <br />Repair <br />32. <br />Asset <br />Repair <br />33. <br />Asset <br />Repair <br />34. <br />Asset <br />Repair <br />35. <br />Asset <br />Repair <br />36. <br />Asset <br />Repair <br />37. <br />Services <br />Additional Days 5 <br />Note to customer <br />grout hole at 4 o'clock at 52.3' <br />grout hole at 10 o'clock at 68.4' <br />grout hole at 2 o'clock at 76.6' <br />grout hole at 12 o'clock at 84.2' <br />grout hole at 12 o'clock at 92' <br />grout hole at 11 o'clock at 102' <br />(1) day <br />MH 1 to 1-2 (P-2) <br />install interior band TBD & grout (1-1/2) days <br />Raise manhole #13 to grade. (1/2) day <br />Raise manhole #14 to grade. (1/2) day <br />Raise manhole #15 to asphalt grade. (1/2) day <br />Raise manhole #16 to grade. (1/2) day <br />Raise manhole #17 to grade. (1/2) day <br />Raise manhole #23 to grade. (1/2) day <br />Raise manhole #24 to grade. (1/2) day <br />Bond <br />Southeast Services offers the above services in this proposal only. <br />All proposals based on hourly rates are billed inclusive of travel time <br />unless noted otherwise. Our proposal does not include Fuel <br />surcharges, dump fees, retainage, surveys, engineering fees, as <br />builts, layouts, permits, M.O.T, sod replacement etc., unless <br />otherwise noted. <br />Client is responsible for clean water supply and dump site for all <br />vacuum truck jobs unless otherwise noted. <br />Southeast Services will charge to client any costs for special <br />conditions (coverages) needed in regards to insurance requirements <br />that are not standard within our policy. <br />Accepted date Accepted by <br />Total <br />1 $7,500.00 $7,500.00 <br />1 $1,850.00 <br />$1,850.00 j <br />1 <br />1 $1,850.00 <br />$1,850.00 <br />1 $2,450.00 <br />$2,450.00 <br />1 $1,850.00 <br />$1,850.00 <br />1 $1,850.00 <br />$1,850.00 <br />1 $1,850.00 <br />$1,850.Oa <br />1 $1,850.00 <br />$1,850:0O <br />1 $6,458.00 <br />$6,458.00 <br />o"Itift" <br />
The URL can be used to link to this page
Your browser does not support the video tag.