A TRUE COPY <br />Project No. 24-314 CERTIFICATION ON LAST PAGE <br />Tract No. FLMEA-INDI-009, FLMEB-INDI-009, FLMEA-INDI-011, FLMEB-INDI-012 RYdN L. BUTLER, CLERK <br />EXHIBIT "A" <br />Attached to and made a part of that certain <br />ENCROACHMENT AGREEMENT <br />Dated 2024 <br />By and between <br />FLORIDA GAS TRANSMISSION COMPANY, LLC <br />And INDIAN RIVER COUNTY <br />ENGINEERING AND CONSTRUCTION SPECIFICATIONS <br />1. No work can be done in FGT's easement property unless FGT has reviewed and approved the plans <br />and an agreement in writing has. been entered into between FGT and COUNTY. Any encroachment <br />consented �to by FGT shall: not interfere with the operation, maintenance, and access of FGT's pipeline <br />facilities, including but not limited to, close interval surveys; leak detection surveys; pipeline patrol, <br />pipeline marking and similar activities. <br />2. COUNTY shall provide' a minimum of forty-eight (48) hours' notice to FGT prior to any <br />installation, construction, excavation, or demolition work on the easement area. To ensure further safety, <br />COUNTY must call appropriate ONE CALL for a locate by calling 811. An FGT representative must be <br />present when any work is done on the easement area. The onsite FGT representative will have the authority <br />to shutdown work by the COUNTY if the COUNTY's activities are judged to be unsafe by the FGT <br />representative. The FGT representative will be invited to participate in COUNTY's safety meetings. This <br />provision applies each time FGT's pipeline facilities are crossed. <br />Existing ground elevation is to be maintained. <br />4. For vehicles and/or construction equipment requesting approval to cross FGT"s faeiiities, each <br />crossing location will be reviewed on a case-by-case, site-specific basis and will require the surveyed <br />elevation of the pipeline anWo;,facility verified by an FGT field representative to be performed by the party <br />requesting the crossing. encroachment:and`;submitted to FGT. The execution of a wheel load calculation <br />must:be completed and,approved by FGT prior to crossing FGT's facilities for every vehicle and/or <br />consiKtiori equipmetit requesting to cross' FGT may require matting or other suitable material be installed <br />to achieve the necessary support for such grossing. This too will be site specific and case-by-case only. <br />5. Where consent for roadway crossings has been granted, a minimum of forty-eight inches (48") of <br />cover, including thirty-six (36") of undisturbed or compacted soil, shall be maintained within the easement <br />area. All roads must cross the easement at a ninety degree (90°) angle. <br />6. Upon completion of paragraph 1, sidewalks, trails and bike paths may cross FGT's pipelines at a <br />ninety degree (90°) angle provided the width does not exceed forty-eight inches (48"). <br />7. When crossing an FGT pipeline (via drill or open lay) COUNTY must visually verify the elevation <br />of the pipeline both vertically and horizontally, by an FGT approved method such as vacuum excavation <br />with an FGT field representative on-site at all times during this operation. When using directional drill <br />method, a minimum vertical clearance of ten feet (10') from the pipeline is required across the entire <br />easement. <br />8. Where the encroachment includes utilities, all such utilities crossing the easement area must have <br />a minimum separation of twenty-four inches (24") between the utility and the FGT pipeline(s) at the point <br />of crossing and must cross at a ninety degree (90°) angle. No utilities shall be constructed between the <br />surface of the easement area and the top of the subsurface pipeline facilities unless agreed to in writing by <br />FGT. No parallel utilities, structures, and/or appurtenances are permitted within the easement area. All <br />proposed aerial crossings will be reviewed on a case-by-case basis. <br />9. Where consent for fiber optic, telephone and/or cable television lines has been granted, lines must <br />be placed in a rigid non-metallic conduit across the entire easement width with bags of concrete -mix placed <br />directly above and below the conduit across the confines of the easement. Orange warning burial tape <br />must be placed a minimum of 18" directly above the cable across the width of the easement. Crossings <br />must be clearly and permanently marked on each side of the easement with permanent identification. <br />10. Where consent for utility lines has been granted, electric lines must be encased in pvc or steel <br />throughout the entire easement area. Cables energized to 600 volts or more must cross a minimum of three <br />feet (3') below the subsurface pipeline facilities, and also be encased in concrete, color coded red, across <br />the entire easement width, and have external, spiral wound, neutrals grounded on each side of the easement. <br />The cable crossing should be clearly and permanently marked on each side of the easement where <br />permissible. <br />