Laserfiche WebLink
EXHIBIT #A <br />PROJECT ID 13.23.538 <br />Indian River County Department of Utility Services <br />Amendment No. 1 to Work Order No. 6 <br />Carrier Equipment Corral versus Temporary Relocation Cost Comparison <br />PROJECT UNDERSTANDING <br />Indian River County Department of Utility Services (IRCDUS) owns and operates the Gifford <br />Elevated Water Tank located at 4690 28d' Ct, Vero Beach, FL 32967. <br />The tank is currently out of service and is instead used to carry telecommunication equipment. <br />The tank was structurally evaluated under the current scope of work to determine what <br />improvements would be necessary to support additional carriers on the tank. The structural <br />improvements identified are currently under construction. Kimley-Horn also identified the need <br />to sandblast and recoat the entire elevated storage tank. This would require relocating the carrier <br />equipment. The equipment could either be relocated to a temporary telecommunication tower <br />during the recoating process or the equipment could be permanently relocated to a corral at the <br />top of the tank. IRCDUS has requested an amendment to the current contract with Kimley-Horn <br />to evaluate the cost difference between the design and construction of a permanent corral on the <br />top of the elevated tank to house the carrier equipment versus relocating the equipment to a <br />temporary tower for the upcoming sandblasting and recoating of the elevated tank. <br />SCOPE OF SERVICES <br />Task 1 (No changes): Structural Analysis Report <br />Task 2 (No changes): Structural Analysis Report w/ Modifications <br />Task 3 (No changes): Modification Design Drawings <br />Task 4 (No changes): Bidding Assistance <br />Task 5 (Amended): Construction Phase Assistance <br />Consultant will prepare a class 5 opinion of probable cost to compare the engineering and <br />construction costs associated with (2) potential scenarios. Scenario I will include the design and <br />construction of a top -mounted corral. Scenario 2 will include the engineering and construction <br />costs to provide a temporary telecommunication structure for the carriers to relocate their <br />equipment off of the water tank structure during the forthcoming sand -blasting operations. <br />Scenario 2 will also include estimates to physically relocate the carriers to the temporary <br />structure, and back to the water tank once coating operations have concluded. <br />Task 5 (Amended): Deliverable <br />Consultant will submit one class 5 opinion of probable cost for each of the two scenarios in PDF <br />format. Consultant will provide a summary by email of their recommendation to IRC for the next <br />phase of improvements at the Gifford Elevated Tank. <br />K:\WPB_Civil\044572077 Gifford Water Tank Mods\MIS\Cost Benefit Analysis Amendment\2025.01.21 - Gifford Water Tank - Amendment 1 <br />- Scope.doc <br />