My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-052
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 1:12:53 PM
Creation date
3/27/2025 1:11:45 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
02/25/2025
Control Number
2025-052
Agenda Item Number
9.P.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Amendment to Work Order for cost benefit analysis to Relocate Cell Carrier Equipment
on Gifford Elevated Storage Tank
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE <br />Consultant will complete this task in a timely manner and mutually agreed upon schedule. The <br />following schedule is estimated below. Actual schedule may vary based on coordination with the <br />client. <br />Task 5: 2 - 3 weeks following NTP <br />FEE SCHEDULE <br />We will provide these services in accordance with the Continuing Contract Agreement for <br />Consulting Engineering Services #2023015 dated May 2nd, 2023, by and between INDIAN <br />RIVER COUNTY, a political subdivision of the State of Florida ("COUNTY") and Kimley- <br />Horn and Associates, Inc., ("Consultant'). <br />The Consultant will provide professional services for a lump sum fee as follows: <br />Task <br />WO #6 <br />Amendment #1 <br />Revised Total <br />Task 1: Structural Analysis Report <br />$8,703 <br />$8,703 <br />Task 2: Structural Analysis Report w/ Modifications <br />$6,569 <br />$6,569 <br />Task 3: Modification Design Drawings <br />$12,803 <br />$12,803 <br />Task 4: Bidding Assistance <br />$6,977 <br />$6,977 <br />Task 5: Construction Phase Assistance <br />$30,344 <br />$4,058 <br />$34,402 <br />Total Tasks 1-5: <br />$65,396 <br />$4,058 <br />$69,454 <br />ADDITIONAL SERVICES <br />The following services can be provided as additional services under future task orders: <br />• Engineering design of the proposed recommendation of the cost estimate comparison <br />• Further construction phase services <br />INFORMATION PROVIDED BY OWNER <br />• Record drawings <br />• Existing and proposed telecommunication equipment information <br />• Site access information <br />K:\WPB_Civil\044572077 Gifford Water Tank Mods\MIS\Cost Benefit Analysis Amendment\2025.01.21 - Gifford Water Tank - Amendment 1 <br />- Scope.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.