My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-058
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-058
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 10:50:59 AM
Creation date
3/31/2025 10:49:13 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
03/11/2025
Control Number
2025-058
Agenda Item Number
9.K.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Engineering Services Work Order No. 17 for Oslo Water Treatment Plant Capital Upgrades & Renewals;
Project Number
IRCDUS Proj. ID 12.25.505
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 1.0 — Assumptions <br />• IRCDUS to provide a review of the technical memorandum prior to the draft <br />review meeting. <br />Task 2 - Capital Upgrades and Renewals Matrix <br />Consultant will attend (1) site visit at the WTP. The site visit will evaluate the necessary <br />improvements to maintain the existing rated capacity of the WTP. The site visit will <br />consist of a walkthrough of each component of the WTP including the following: <br />• Raw water system <br />• Cartridge filter vessels <br />• Process piping <br />• Post treatment system including blowers, scrubbers, recirculation pumps, <br />degasifiers, clearwell support structure and mixing bay <br />• Chemical systems including scale inhibitor, sulfuric acid, caustic, CO2, and <br />chlorine <br />• Electrical and Standby Emergency Power - Consultant will utilize the services of <br />subconsultant C&W Engineering to evaluate the necessary improvements of the <br />existing electrical system. <br />• General site maintenance items <br />• Building components including containment structures, air intake louvers, <br />exhaust fans, doors, coating systems, etc. <br />Consultant will create a matrix to prioritize the improvements identified in the WTP site <br />visit. The matrix deliverable will be provided in a tabulated format and be utilized to <br />calculate and assign a priority level to each individual item. Prioritization will be based <br />on the primary objectives that include, but are not limited to improvements for regulatory <br />compliance, reliability, efficiency and resilience. The matrix table will include the <br />following criteria: <br />• Criticality to treatment/water quality <br />• Criticality to high service pumping <br />• Impacts to treatment <br />• Impacts to operation <br />• Impacts to maintenance <br />• Intangibles such as permitting, operating cost impacts, resiliency, efficiency, <br />reliability, etc. <br />• Capital costs. Consultant will prepare a Class 5 Opinion of Probable Construction <br />Costs (OPCC) for the proposed improvements. <br />Task 2.0 — Deliverables <br />• Matrix and recommendations to be provided in the technical memorandum. <br />Task 2.0 — Assumptions <br />• IRCDUS to provide all requested historical data and provide access to the WTP. <br />K\WPB_Civil\General\King\Marketing\IRCDUS\Oslo WTP Maintenance Projects\2025.0107 Oslo WTP Maintenance Projects - <br />Scope.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.